Session 6
Project Development
Tuesday, October 16
Room: 212 MSC
| Speaker: | Gus Cannon |
| Title: | Director, Resource Management Section |
| Company: | Texas Department of Transportation |
| Location: | Austin, TX |
| Presentation Title: | Lump Sum Distribution of TxDOT UTP Categories 2 & 3 Funds |
| Presentation Summary: | Presentation of right of way cost studies. |
| Bio/Expertise Highlights: | Responsiblities include monitoring of Strategy 102 budget allocations and expenditures. |
| A/V Needs: | podium with microphone, LCD projector |
| Speaker: | Montie Wade |
| Title: | Program Manager/Senior Research Engineer |
| Company: | Texas Transportation Institute |
| Location: | Arlington, TX |
| Presentation Title: | Lump Sum Distribution |
| Presentation Summary: | One element of the TxDOT initiative to establish a |
| Bio/Expertise Highlights: | Facilitation of the Work Group which developed recommendations for implementation. |
| A/V Needs: | podium with microphone, walk-around microphone, LCD projector |
| Speaker: | Jimmey Bodiford |
| Title: | Director of Transportation Operations |
| Company: | Texas Department of Transportation |
| Location: | Fort Worth, TX |
| Presentation Title: | Weatherford Pass-Through Toll Projects |
| Presentation Summary: | I will present a brief presentation of the Weatherford Pass-Through Toll Projects as are coordinated between the City of Weatherford and TxDOT. |
| Bio/Expertise Highlights: | As the Parker County Area Engineer during the planning stages I oversaw the contract agreement for the Weatherford Pass-Through Toll Projects until February 2007 when I assumed the responsibilites as the Fort Worth District Director of Transportation Operations. |
| A/V Needs: | podium with microphone, LCD projector Laptop PC for PowerPoint Presentation |
| Speaker: | Paul Hoelscher |
| Title: | Director of Construction |
| Company: | Texas Department of Transportation |
| Location: | Abilene, TX |
| Presentation Title: | Spot Removal of Lead-based Paint on Bridge Rehab Projects |
| Presentation Summary: | The presentation provides an overview of policies and specifications, Abilene District experience, things learned, and contracting methods for spot removal of lead-based paint for the purpose of dismantling steel elements on bridge rehab projects. |
| Bio/Expertise Highlights: | Up to this point, this has not been properly planned for which has caused it to be done during construction. We have experimented with various contracting methods and have developed an implementation plan to handle during the planning stage rather than construction. |
| A/V Needs: | podium with microphone, LCD projector None |
| Moderator: | William Hale |
| Title: | Dallas District Engineer |
| Company: | Texas Department of Transportation |
| Location: | Mesquite, TX |
| Presentation Title: | Moderator for (1) Coordinating Pass-Through Financed Projects with Outside Entities; (2) Asbestos and Hazardous Materials Abatement in Project Development |
| Presentation Summary: | Chair and Moderator for Session 6 - Project Development |
| Bio/Expertise Highlights: | Served as Chair and Moderator of Project Development Session at 2006 Short Course. |
| A/V Needs: | N/A |
| Speaker: | Wayne Wells |
| Title: | Director, Letting Management |
| Company: | Texas Department of Transportation |
| Location: | Austin, TX |
| Presentation Title: | Panel Discussion on Total Project Cost |
| Presentation Summary: | Update on progress of total Project Cost initiative. |
| Bio/Expertise Highlights: | Part of working group tasked with developing criterion to capture total development, construction and ROW costs for construction projects. Worked in this area for over 20 years. |
| A/V Needs: | podium with microphone, LCD projector just need a laptop that can accomodate PowerPoint. I will bring a jump drive to plug into it. |
| Speaker: | David Roberts |
| Title: | ROW Supervisor - Utilities and USTs |
| Company: | |
| Location: | Houston, TX |
| Presentation Title: | Integrate ROW Functions Early in the Project Development Process and Sleep Better at Night: Examples from the US 290 Reconstruction Program |
| Presentation Summary: | This presentation will describe an integrated approach to ROW and project development using examples from the US 290 Reconstruction Program. |
| Bio/Expertise Highlights: | Mr. Roberts has 18 years of environmental, civil and geotechnical engineering consulting experience, has worked in Houston District ROW for 3 years, and has served as the Houston District ROW Supervisor for Utilities and USTs for just under 2 years. |
| A/V Needs: | podium with microphone, LCD projector Laser Pointer |
| Speaker: | James Koch |
| Title: | Director of Design |
| Company: | Texas Department of Transportation |
| Location: | Houston, TX |
| Presentation Title: | Asbestos and Harzardous Material Abatement in Project Developmen |
| Presentation Summary: | This presentation will provide a description of the asbestos and hazardous material abatement required for the US 90A Project in the Houston District. |
| Bio/Expertise Highlights: | I have over fifteen years of experience in the Houston District in dealing with asbestos and hazardous material issues on TxDOT projects. |
| A/V Needs: | podium with microphone, LCD projector |
| Speaker: | Wesley Naumann |
| Title: | Project Manager |
| Company: | Texas Department of Transportation |
| Location: | Houston, TX |
| Presentation Title: | Coordinating Pass-Through Financed Projects with Outside Entities |
| Presentation Summary: | I will give a brief overview of Houston District's PTF projects and discuss how we are implementing the terms of the Agreement. |
| Bio/Expertise Highlights: | I have 25 years experience with TxDOT, mostly in PS&E development. For the past two years I've been the Developer's primary point of contact for PTF projects. I also serve as the design Project Manager and coordinate between Developer and various Houston District sections. |
| A/V Needs: | podium with microphone powerpoint presentation |
| Speaker: | David Seago |
| Title: | Assistant Director of Construction |
| Company: | Texas Department of Transportation |
| Location: | Mesquite, TX |
| Presentation Title: | Asbestos Abatement of Bridges |
| Presentation Summary: | How the Dallas District handles identification and removal of asbestos materials as it relates to bridges. |
| Bio/Expertise Highlights: | I have 18.5 years of design and construction experience with TxDOT. I have designed and inspected the constuction and demolition of bridges as an inspector, designer, engineer and manager. I have overseen District BRINSAP. I am a certified NHI bridge inspector. |
| A/V Needs: | podium with microphone |
| Speaker: | ISSAM TALJE |
| Title: | DISTRICT HYDRAULIC ENGINEER |
| Company: | TXDOT |
| Location: | HOUSTON, TX |
| Presentation Title: | SPECIAL STUDIES FOR PROJECT DEVELOPMENT |
| Presentation Summary: | DRAINAGE ANALYSIS FOR DETENTION REQUIREMENTS IN THE DEVELOPMENT STAGE. |
| Bio/Expertise Highlights: | HYDRAULIC ENGINEER FOR THE HOUSTON DISTRICT. |
| A/V Needs: | podium with microphone, LCD projector POWER POINT |