Publications

Quick Search

Begin typing a title, author, or keyword.

TitleReport NumberAuthor(s)Date
TxDOT Administration Research: Tasks Completed FY20110-6581-TI-3S. Anderson, C.P. Beaty, L. Ding, D.R. Ellis, J.A. Epps, C.K. Estakhri, B.A. Glover, M.L. Hoelscher, N.D. Norboge, R. Rajbhandari, T.L. Ramani, T. Scullion, J.A. Shelton, C. Shon, W.R. Stockton, S.R. Vadali, S.P. Venglar, J. ZietsmanApril 2012
Effect of Voids in Grouted, Post-Tensioned Concrete Bridge Construction0-4588-SD. Trejo, M.B. Hueste, P. Gardoni, K.F. Reinschmidt, R.G. Pillai, S. Im, S. Kataria, S. Hurlebaus, M.H. Gamble, T. NgoOctober 2009
Corrosion Performance Tests for Reinforcing Steel in Concrete: Technical Report0-4825-1D. Trejo, C. Halmen, K.F. ReinschmidtOctober 2009
Effect of Voids in Grouted, Post-Tensioned Concrete Bridge Construction: Volume 1- Electrochemical Testing and Reliability Assessment0-4588-1 (VOL1)D. Trejo, M.B. Hueste, P. Gardoni, R.G. Pillai, K.F. Reinschmidt, S. Im, S. Kataria, S. Hurlebaus, M.H. Gamble, T. NgoSeptember 2009
Effect of Voids in Grouted, Post-Tensioned Concrete Bridge Construction: Volume 2 - Inspection, Repair, Materials, and Risks0-4588-1 (VOL-2)D. Trejo, M.B. Hueste, P. Gardoni, R.G. Pillai, K.F. Reinschmidt, S. Im, S. Kataria, S. Hurlebaus, M.H. Gamble, T. NgoSeptember 2009
Corrosion Performance Tests for Reinforcing Steel in Concrete0-4825-SD. Trejo, C. Halmen, K.F. ReinschmidtApril 2009
Effect of Voids in Grouted, Post-Tensioned Concrete Bridge Construction: Seminar Slides0-4588-P2D. Trejo, M.B. Hueste, P. Gardoni, K.F. Reinschmidt, S. Hurlebaus, R.G. Pillai, S. Im, S. Kataria, M.H. Gamble, T. NgoFebruary 2009
Evaluation of Ways and Procedures to Reduce Construction Cost and Increase Competition0-6011-1I. Damnjanovic, S. Anderson, A.J. Wimsatt, K.F. Reinschmidt, D.K. PanditJanuary 2009
Synthesis on Construction Unit Cost Development: Technical Report0-6023-1S. Anderson, I. Damnjanovic, A. Nejat, S. RameshJanuary 2009
Feasibility Study for Development of Marine Exposure Site: Technical Report0-5266-1K.F. Reinschmidt, D. Trejo, K.J. Folliard, H. KimMay 2008
Evaluations of Ways and Procedures to Reduce Construction Costs and Increase Competition0-6011-SI. Damnjanovic, S. Anderson, A.J. Wimsatt, K.F. Reinschmidt, D.K. PanditJanuary 2008
Feasibility Study for Development of Marine Exposure Site0-5266-SK.F. Reinschmidt, D. Trejo, K.J. Folliard, H. Kim 2007
Development of Warranty Based Specifications for Construction0-4498-3S. Anderson, B.C. Blaschke, D. Trejo, O.C. ErbaturJanuary 2006
Development of TxDOT Warranty Implementation Plan0-4498-SS. Anderson, D. Trejo, B.C. Blaschke, O.C. ErbaturJanuary 2006
Draft Warranty Implementation Plan0-4498-P4S. Anderson, B.C. Blaschke, D. Trejo, O.C. ErbaturJanuary 2005
Contract Negotiation Tools for Professional Services on Highway Projects0-4297-1D. FordOctober 2004
Draft Warranty Specifications0-4498-1S. Anderson, B.C. Blaschke, D. Trejo, O.C. ErbaturOctober 2003
Assessment of Impacts from Construction Equipment Restrictions in Select Texas Nonattainment Areas0-4190-6J.A. Crawford, D. Trejo, J.H. Overman, R.J. Benz, D.W. Fenno, S. Anderson, D.G. Perkinson, S. Knuennen, R.P. De Las Casas, R.K. DeshmukhAugust 2001
Potential Cost and Schedule Impact of Texas Natural Resource Conservation Commission's Proposed Rule Restricting the Use of Construction Equipment0-4190-3D. Trejo, S. Anderson, S.T. KuennenJanuary 2001
Current use of Warranties in Highway ConstructionTRB 990516J.S. Russell, A. Hanna, S. Anderson, P. Wisely, R.J. Smith 1999
Innovative Contracting Methods for Highway Construction ProjectsTRB 990520D.D. Noble, J.S. Russell, S. Anderson, A. Hanna, R.J. Smith 1999
Multi-Parameter Bidding: Development o ParametersTRB 990732S. Rahman, S. Anderson, J.S. Russell, L.Y. Hogue 1999
Accelerated Construction Methodology for Concrete Pavements at Urban Intersections1454-1FS. Secmen, J. Schwarz, S. Anderson, D.G. ZollingerNovember 1996
Road User Costs and the Influence of Pavement Type - A PerspectiveTTI-1992-18S. Anderson, J.L. Memmott, S.S. PatilMay 1992