Expert Review Panel for Eastside Corridor Express Toll Lanes

Sponsor: Washington Department of Transportation

Period of Performance: August 2010 – June 2011

TTI led an Expert Review Panel (ERP) which provided an evaluation of the Eastside Corridor Tolling Study (I-405/SR 167).  The panel was formed to examine consistency with emerging federal policy and current state and regional policies; the validity of technical analytical measures and results support the Eastside Corridor Express Toll Lanes Report; the soundness of the report results; the practicality of the phasing plan proposed to implement express toll lanes; and, the validity of financial assumptions, methods, and forecasts supporting the report.