Access a list of publications associated with the Research & Implementation – San Antonio and Utility Engineering programs.
Research & Implementation – San Antonio
Title | Report Number | Author(s) | Date |
---|---|---|---|
Valuation Methodology and Framework for Estimation of Right-of-Way Value | 0-7053-R1 | E. Kraus, W.A. Holik, P. Anderson, C.A. Quiroga, S.M. Trojacek | August 2023 |
Traffic Control Device Analysis, Testing, and Evaluation Program: FY2022 Activities | 0-7096-R2 | M.D. Finley, S.P. Venglar, M.P. Pratt, J.G. Hudson | August 2023 |
0-7053: Quantifying the Valuation of Right-of-Way | 0-7053-PSR | E. Kraus, W.A. Holik, P. Anderson, C.A. Quiroga, S.M. Trojacek | August 2023 |
Traffic Control Device Analysis, Testing, and Evaluation Program: FY20221 Activities | 0-7096-R1 | M.D. Finley, L. Theiss, S.P. Venglar, J.A. Habermann, A.M. Pike | August 2023 |
0-7131: Leveraging Artificial Intelligence (AI) Techniques to Detect, Forecast, and Manage Freeway Congestion | 0-7131-PSR | S. Das, I. Tsapakis, M.N. Khan, J. Liu, D. Mills, M.A. Miller, K.N. Balke, J. Wu, M. Azimi, Y. Qi | September 2023 |
Leveraging Artificial Intelligence (AI) Techniques to Detect, Forecast, and Manage Freeway Congestion: Technical Report | 0-7131-R1 | S. Das, I. Tsapakis, M.N. Khan, J. Liu, D. Mills, M.A. Miller, K.N. Balke, J. Wu, M. Azimi, Y. Qi | September 2023 |
0-7125: Expand Applications for Texas Connected Freight Corridors | 0-7125-PSR | N.S. Wood, P. Anderson, M.Q. Le, D.R. Middleton, R.W. Saylor, J.E. Warner | December 2022 |
Calibrating the Highway Safety Manual Predictive Methods for Texas Highways: Technical Report | 0-7083-R1 | S.R. Geedipally, K.K. Dixon, L. Wu, M.P. Pratt, R.E. Avelar, S. Das, I. Tsapakis, D. Lord, G. Saini | December 2022 |
0-7083: Calibrating the Highway Safety Manual Predictive Methods for Texas Highways | 0-7083-PSR | S.R. Geedipally, K.K. Dixon, L. Wu, M.P. Pratt, R.E. Avelar, S. Das, I. Tsapakis, D. Lord, G. Saini | December 2022 |
Potential Applications to Expand the Texas Connected Freight Corridors System | 0-7125-R1 | N.S. Wood, P. Anderson, M.Q. Le, D.R. Middleton, R.W. Saylor, J.E. Warner | December 2022 |
Evaluation of Highway Safety Improvement Projects and Countermeasures | 0-6961-P4 | I. Tsapakis | August 2021 |
Safety and Cost Effectiveness Evaluation Tools for Intersections and Segments | 0-6961-P3 | I. Tsapakis, S. Sharma, B. Dadashova, S.R. Geedipally, A. Sanchez, M.Q. Le, S. Das, K.K. Dixon | August 2021 |
Capacity and Cost Benefits of Super 2 Corridors | 0-6997-R1 | M.A. Brewer, T.D. Barrette, D.H. Florence, B.A. Glover, K.M. Fitzpatrick, S.P. Venglar | August 2021 |
Develop Capacity and Cost Benefits of Super 2 Corridors | 0-6997-PSR | M.A. Brewer, T.P. Barrette, D.H. Florence, B.A. Glover, K. Fitzpatrick, S.P. Venglar | October 2021 |
Evaluation of Roadside Treatments to Mitigate Roadway Departure Crashes | 0-6991-PSR | R.E. Avelar, S.R. Geedipally, L. Wu, B. Kutela, I. Tsapakis, D. Lord | April 2020 |
Evaluation of Roadside Treatments to Mitigate Roadway Departure Crashes: Technical Report | 0-6991-R1 | R.E. Avelar, S.R. Geedipally, S. Das, L. Wu, B. Kutela, D. Lord, I. Tsapakis | April 2020 |
Accuracy of Probe-Based Annual Average Daily Traffic (AADT) Estimates in Border Regions | I. Tsapakis, L.E. Cornejo, A. Sanchez | January 2020 | |
Temporary Saltwater Pipelines: Current Practice and Recommendations | 0-6886-R1 | C.A. Quiroga, W.A. Holik, J. Li, I. Tsapakis, D.H. Bierling | June 2019 |
Guidelines for Installing, Operating, and Maintaining Temporary Saltwater Pipelines | 0-6886-P1 | C.A. Quiroga, W.A. Holik, J. Li | June 2019 |
Engineering Guidelines for Installing Temporary Lines within the Right of Way | 0-6886-PSR | C.A. Quiroga, W.A. Holik, J. Li, I. Tsapakis, D.H. Bierling | June 2019 |
Statewide Implementation of Innovative Safety Analysis Tools in Identifying Highway Safety Improvement Projects | 5-6912-01-PSR | I. Tsapakis, W.A. Holik, S.R. Geedipally, S.S. Samant, K.K. Dixon | November 2019 |
Evaluation of Highway Safety Improvement Projects and Countermeasures | 0-6961-PSR | I. Tsapakis, S. Sharma, B. Dadashova, S.R. Geedipally, A. Sanchez, M.Q. Le, L.E. Cornejo, S. Das, K.K. Dixon | November 2019 |
Statewide Implementation of Innovative Safety Analysis Tools in Identifying Highway Safety Improvement Projects: Technical Report | 5-6912-01-R1 | I. Tsapakis, W.A. Holik, S.R. Geedipally, S.S. Samant, K.K. Dixon | October 2019 |
Evaluation of Highway Safety Improvement Projects and Countermeasures: Technical Report | 0-6961-R1 | I. Tsapakis, S. Sharma, B. Dadashova, S.R. Geedipally, A. Sanchez, M.Q. Le, L.E. Cornejo, S. Das, K.K. Dixon | October 2019 |
Traffic Control Device Evaluation Program: FY 2017 | 9-1001-14-4 | M.D. Finley, S.T. Chrysler, P.J. Carlson, A.M. Pike, E. Park, M.P. Pratt, R.E. Avelar, S.R. Sunkari, S.P. Venglar, J.M. Kaufman, S.A. Cooner, J.G. Hudson | March 2018 |
Innovative Tools and Techniques in Identifying Highway Safety Improvement Projects: Technical Report | 0-6912-1 | I. Tsapakis, K.K. Dixon, J. Li, B. Dadashova, W.A. Holik, S. Sharma, S.R. Geedipally, J.T. Le | August 2017 |
Innovative Tools and Techniques in Identifying Highway Safety Improvement Projects | 0-6912-S | I. Tsapakis, K.K. Dixon, J. Li, B. Dadashova, W.A. Holik, S. Sharma, S.R. Geedipally, J.T. Le | August 2017 |
Integration of Right of Way Project Schedules for Decision-Making Purposes | 0-6892-S | C.A. Quiroga, I. Tsapakis, E. Kraus, W.A. Holik, J.H. Overman, D. Kang | February 2017 |
Management of Real Property Acquisition Activities at TxDOT | 0-6892-1 | C.A. Quiroga, I. Tsapakis, E. Kraus, W.A. Holik | February 2017 |
Design and Operation of U-Turns at Diamond Interchanges in Texas | 0-6894-1 | J.M. Tydlacka, H. Zhou, K.K. Dixon, R.E. Avelar, L. Ding, S.P. Venglar, N.A. Chaudhary, M.A. Brewer | September 2017 |
Guidelines for Design and Operation of U-Turns | 0-6894-S | J.M. Tydlacka, H. Zhou, K.K. Dixon, R.E. Avelar, L. Ding, S.P. Venglar, N.A. Chaudhary, M.A. Brewer | 2017 |
Truck Axle Weight Distributions | C.A. Quiroga, J. Li, J.T. Le | July 2016 | |
ITS Strategic Plan for Texas | 0-6672-P1 | B.T. Kuhn, K.N. Balke, N.A. Chaudhary, D.L. Jasek, R. Rajbhandari, A.P. Voigt, K.M. Miller, T.S. Geiselbrecht, S.P. Venglar, E.J. Seymour | July 2016 |
Executive Plan Summary, An ITS Strategic Plan for Texas | 0-6672-3 | B.T. Kuhn, K.N. Balke, N.A. Chaudhary, D.L. Jasek, R. Rajbhandari, A.P. Voigt, K.M. Miller, T.S. Geiselbrecht, S.P. Venglar, E.J. Seymour | July 2016 |
Maintaining Project Consistency with Transportation Plans throughout the Project Life Cycle with an Emphasis on Maintaining Air Quality Conformity: Technical Report | 0-6758-1 | R. Farzaneh, M.E. Kenney, J. Prozzi, Y. Zhang, T.B. Carlson, Y. Li, T.L. Ramani, J. Zietsman | July 2016 |
Descriptive Statistics and Well County Maps | C.A. Quiroga, I. Tsapakis, W.A. Holik | June 2016 | |
Traffic Loads for Developing and Operating Individual Wells | C.A. Quiroga, E. Kraus, I. Tsapakis | June 2016 | |
Evaluation of TxDOT Variable Speed Limit Pilot Projects: Final Report | TTI-2015-10 | B.T. Kuhn, K.N. Balke, R.E. Brydia, L. Theiss, I. Tsapakis, L. Ruback, M.Q. Le | June 2015 |
Oil and Gas Energy Developments and Changes in Pavement Conditions in Texas | PRC 14-35F | C.A. Quiroga, I. Tsapakis, E. Kraus, J.T. Le, A.J. Wimsatt | March 2015 |
Reducing Lane and Shoulder Width to Permit an Additional Lane on a Freeway: Technical Report | 0-6811-1 | K.K. Dixon, K. Fitzpatrick, R.E. Avelar, M.E. Perez, S.E. Ranft, R. Stevens, S.P. Venglar, A.P. Voigt | March 2015 |
Oil and Gas Energy Developments and Changes in Crash Trends in Texas | PRC 15-35 F | C.A. Quiroga, I. Tsapakis | October 2015 |
Reducing Lane and Shoulder Width to Permit an Additional Lane on a Freeway | 0-6811-S | K.K. Dixon, K. Fitzpatrick, R.E. Avelar, M.E. Perez, S.E. Ranft, R. Stevens, S.P. Venglar, A.P. Voigt | 2015 |
TxDOT ITS Strategic Plan 2013 | 0-6672-2 | E.J. Seymour, B.T. Kuhn, K.N. Balke, N.A. Chaudhary, D.L. Jasek, R. Rajbhandari, A.P. Voigt, K.M. Miller, T.S. Geiselbrecht, S.P. Venglar | April 2014 |
Research to Develop an ITS Strategic Plan for Texas | 0-6672-2 | E.J. Seymour, B.T. Kuhn, K.N. Balke, N.A. Chaudhary, D.L. Jasek, R. Rajbhandari, A.P. Voigt, K.M. Miller, T.S. Geiselbrecht, S.P. Venglar | April 2014 |
Assessment of the Effectiveness of Wrong Way Driving Countermeasures and Mitigation Methods | 0-6769-1 | M.D. Finley, S.P. Venglar, V. Iragavarapu, J.D. Miles, E. Park, S.A. Cooner, S.E. Ranft | December 2014 |
Wrong Way Driving Countermeasures | 0-6769-S | M.D. Finley, S.P. Venglar, V. Iragavarapu, J.D. Miles, E. Park, S.A. Cooner, S.E. Ranft | 2014 |
Maintaining Project Consistency with Transportation Plans through the Project Life-cycle with an Emphasis on Maintaining Air Quality Conformity | 0-6758-S | R. Farzaneh, M.E. Kenney, J. Prozzi, T.B. Carlson, Y. Li, T.L. Ramani | 2014 |
ITS Strategic Plan for Texas | 0-6672-S | E.J. Seymour, B.T. Kuhn, K.N. Balke, N.A. Chaudhary, D.L. Jasek, R. Rajbhandari, A.P. Voigt, K.M. Miller, T.S. Geiselbrecht, S.P. Venglar | 2014 |
Utility Investigation Best Practices and Effects on TxDOT Highway Improvement Projects | 0-6631-1 | E. Kraus, Y. Li, J.H. Overman, C.A. Quiroga | April 2013 |
Optimizing Utility Owner Participation in the Project Development and Delivery Process | 0-6624-1 | C.A. Quiroga, Y. Li, E. Kraus, J.T. Le | April 2013 |
Integrated Prioritization Method for Active and Passive Highway-Rail Crossings | 0-6642-1 | A. Weissmann, J. Weissmann, J.L. Kunisetty, J.E. Warner, A.A. Protopapas, E. Park, S.P. Venglar, S. Sunkari | January 2013 |
Best Practices for Utility Investigations in the TxDOT Project Development Process | 0-6631-S | E. Kraus, Y. Li, J.H. Overman, C.A. Quiroga | 2013 |
TxDOT Administration Research: Tasks Completed FY2011 | 0-6581-TI-3 | S. Anderson, C.P. Beaty, L. Ding, D.R. Ellis, J.A. Epps, C.K. Estakhri, B.A. Glover, M.L. Canton, N.D. Norboge, R. Rajbhandari, T.L. Ramani, T. Scullion, J.A. Shelton, C. Shon, W.R. Stockton, S.R. Vadali, S.P. Venglar, J. Zietsman | April 2012 |
Accommodating Oversize and Overweight Loads: Instructor and Student Guide | 0-6404-P2 | D.R. Middleton, Y. Li, J.T. Le | August 2012 |
Synthesis Study of Texas Signal Control Systems: Technical Report | 0-6670-1 | D. Sun, L. Dodoo, H.K. Penumala, A. Rubio, H. Zhou, M.P. Pratt, S.R. Sunkari | December 2012 |
Accommodating Oversize and Overweight Loads: Technical Report | 0-6404-1 | D.R. Middleton, Y. Li, J.T. Le, N.A. Koncz | July 2012 |
Strategies to Encourage and Facilitate Utility Owner Participation in Transportation Projects: Guidebook and Training Materials | 0-6624-P1 | C.A. Quiroga, E. Kraus, Y. Li, J.T. Le | November 2012 |
Winter Weather Response Guide | 0-6669-P1 | J. Perkins, D.L. Jasek, J. Mwakalong, J.L. Carson, K.O. Obeng-Boampong, G. Pesti | October 2012 |
Research on Best Practices for Winter Weather Operations | 0-6669-1 | J. Perkins, J. Mwakalonge, D.L. Jasek, J.L. Carson, K.O. Obeng-Boampong, G. Pesti | October 2012 |
Improving the Response and Participation by Utility Owners in the Project Development Process | 0-6624-S | C.A. Quiroga, Y. Li, E. Kraus, J.T. Le | 2012 |
Accommodating Oversize & Overweight Loads | 0-6404-S | D.R. Middleton, Y. Li, J.T. Le | 2012 |
Developing Warrants for Active Warning Devices at Low-Volume Highway-Rail Grade Crossings | 0-6642-S | J. Weissmann, A. Weissmann, J.L. Kunisetty, J.E. Warner, A.A. Protopapa, E. Park, S.P. Venglar, S.R. Sunkari | 2012 |
Prototype Design for a Predictive Model to Improve Evacuation Operations: Technical Report | 0-6121-1 | R.H. Henk, P. Songchitruksa, S.P. Venglar, G. Lim | August 2011 |
Evaluating the Impact of Overweight Load Routing on Buried Utility Facilities | 0-6394-2 | E. Kraus, J.H. Oh, E.G. Fernando, E. Li, C.A. Quiroga, N.A. Koncz | December 2011 |
Evaluating the Impact of Overweight Load Routing on Buried Utility Facilities | 0-6394-1 | E. Kraus, E.G. Fernando, Y. Li, J.H. Oh, N.A. Koncz, C.A. Quiroga | February 2011 |
Use of Existing Information Systems and Data to Support Bridge Management at TxDOT | 0-6389-P1 | C.A. Quiroga, N.A. Koncz, J.T. Le, Y. Li, A.J. Wimsatt | February 2011 |
TxDOT Administration Research: Tasks Completed FY2010 | 0-6581-TI-2 | R.T. Baker, L. Ding, J. Epps, C.K. Estakhri, G. Fry, T.S. Geiselbrecht, V.D. Goodin, J.G. Hudson, T.J. Lomax, C.A. Morgan, J.P. Orsak, D.L. Schrank, T. Scullion, W.R. Stockton, S.P. Venglar, J.C. Villa, B.A. Wood, D.M. Winterich, R.E. Lee, J. Zietsman | February 2011 |
Real-Timing the 2010 Urban Mobility Report | UTCM 10-65-55 | T.J. Lomax, D.L. Schrank, S.M. Turner, T. Geng, Y. Li, N. Koncz | February 2011 |
Planning Tools to Assess the Real Estate Leveraging Potential for Roadways and Transit: Technical Report | 0-6538-1 | S.R. Vadali, R. Aldrete, A. Bujanda, S. Samant, Y. Li, T.S. Geiselbrecht, B.T. Kuhn, S. Lyle, K. Dalton, M. Zhang, S. Tooley | January 2011 |
Treatments to Reduce the Frequency of Freeway Exit Sign Hits | 0-6120-1 | G. Pesti, K.O. Obeng-Boampong, P. Songchitruksa, L. Theiss | June 2011 |
Operations and Safety of Super 2 Corridors with Higher Volumes | 0-6135-1 | M.A. Brewer, S.P. Venglar, L. Ding, K. Fitzpatrick, B. Park | June 2011 |
Delivery of Pilot Workshop on Preserving and Enhancing the Functionality of Highways in Texas | 5-6208-01-1 | E.N. Hard, B.S. Bochner, Y. Li | March 2011 |
Work Zone Positive Protection Guidelines | 0-6163-1 | G.L. Ullman, V. Iragavarapu, D. Sun | May 2011 |
Benefits of Public Roadside Safety Rest Areas in Texas: Technical Report | 0-6267-2 | J.L. Carson, V.J. Pezoldt, N.A. Koncz, K.O. Obeng-Boampong | May 2011 |
Prototype Decision-Making Software (web-based) | 0-6121-P1 | R.H. Henk, P. Songchitruksa, S.P. Venglar, G. Lim | November 2011 |
Framework for a Comprehensive Bridge Management and Information System | 0-6389-1 | C.A. Quiroga, J. Weissmann, N.A. Koncz, J.T. Le, Y. Li, A.J. Wimsatt | November 2011 |
An Evaluation of the Performance of High Impact Signs | 0-6120-S | G. Pesti, K.O. Obeng-Boampong, P. Songchitruksa, L. Theiss | 2011 |
Super 2 Design for Higher Traffic Volumes | 0-6135-S | M.A. Brewer, S.P. Venglar, L. Ding, K. Fitzpatrick, B. Park | 2011 |
Benefits of Public Roadside Safety Rest Areas in Texas | 0-6267-S | J.L. Carson, V.J. Pezoldt, N.A. Koncz, K.O. Obeng-Boampong | 2011 |
Improved Positive Protection Guidance for Work Zones | 0-6163-S | G.L. Ullman, V. Iragavarapu, D. Sun | 2011 |
Framework for Comprehensive Bridge Management and Information System (BMIS) | 0-6389-S | A.J. Wimsatt, C.A. Quiroga, J. Weissmann, N.A. Koncz, J.T. Le, Y. Li | 2011 |
Evaluation of Overweight Load Routing on Buried Utility Plant | 0-6394-S | E. Kraus, J.H. Oh, E.G. Fernando, Y. Li, C.A. Quiroga, N.A. Koncz | 2011 |
Prototype Design for a Predictive Model to Improve Evacuation Operations | 0-6121-S | R.H. Henk, P. Songchitruksa, S.P. Venglar, S.S. Samant, G. Lim | 2011 |
Integrating Utility Conflict Elimination and Environmental Processes | 0-6065-S | C.A. Quiroga, E. Kraus, J.H. Overman, N.A. Koncz | February 2010 |
Consistent Signal Timing Strategies at Intersections with Wide Medians to Improve Efficiency and Safety | 0-6176-S | S.R. Sunkari, P. Songchitruksa, X. Zeng, K.N. Balke, K.O. Obeng-Boampong | February 2010 |
Preserving the Functionality/Asset Value of the State Highway System: Technical Report | 0-6208-1 | E.N. Hard, B.S. Bochner, Y. Li, Y. Qi, I. Damnjanovic, W.E. Frawley | February 2010 |
Integration of Utility and Environmental Activities in the Project Development Process | 0-6065-1 | C.A. Quiroga, E. Kraus, J.H. Overman, N.A. Koncz | January 2010 |
Guidelines for Signal Operations at Intersections with Wide Medians | 0-6176-1 | S.R. Sunkari, P. Songchitruksa, X. Zeng, K.N. Balke, K.O. Obeng-Boampong | March 2010 |
Improving Mobility Information with Better Data and Estimation Procedures | UTCM 09-17-09 | T.J. Lomax, B. Wang, D.L. Schrank, W.L. Eisele, S.M. Turner, D.R. Ellis, Y. Li, N.A. Koncz, T. Geng | March 2010 |
Guidebook on Preserving the Functionality of State Highways in Texas | 0-6208-P1 | E.N. Hard, B.S. Bochner, Y. Li | May 2010 |
Strategies and Recommendations for Integrating Utility and Environmental Processes at TxDOT | 0-6065-P1 | C.A. Quiroga, E. Kraus, J.T. Le | May 2010 |
Best Practices for Accommodating Pedestrians at International Bridge Crossings | 186040-00005-1 | S.P. Venglar, K.P. Fierro | September 2010 |
Workshop Materials for Preserving and Enhancing the Functionality of Highways in Texas | 0-6208-P2 | E.N. Hard, B.S. Bochner, Y. Li | September 2010 |
Preserving Functionality/Asset Value of the State Highway System | 0-6208-S | E.N. Hard, B.S. Bochner, Y. Li, I. Damnjanovic, W.E. Frawley, Y. Qi | 2010 |
Planning Tools to Assess the Real Estate Leveraging Potential for Roadways and Transit | 0-6538-S | S.R. Vadali, R. Aldrete, A. Bujanda, S. Samant, Y. Li, B.T. Kuhn, T.S. Geiselbrecht, S. Lyle, M. Zhang, K. Dalton, S. Tooley | 2010 |
Utility Accommodation and Conflict Tracker (UACT) Installation and Configuration Manual | 0-5475-2 | E. Kraus, J.T. Le, H. Dawood | April 2009 |
Development of a Utility Conflict Management System | 0-5475-4 | E. Kraus, C.A. Quiroga, N.A. Koncz, H. Dawood | April 2009 |
Frontage Road Yield Treatment Analysis Tool (FRYTAT) Database: User Guide | 0-4986-P2 | K.O. Obeng-Boampong, L. Ding, R.H. Henk, M.Y. Garcia | August 2009 |
Performance Evaluation of Cable Median Barrier Systems in Texas | 0-5609-1 | S.A. Cooner, Y.K. Rathod, D.C. Alberson, R.P. Bligh, S.E. Ranft, D. Sun | August 2009 |
Development of Guidelines for Cable Median Barrier Systems in Texas | 0-5609-2 | S.A. Cooner, Y.K. Rathod, D.C. Alberson, R.P. Bligh, S.E. Ranft, D. Sun | December 2009 |
Speeds in School Zones | 0-5470-1 | K. Fitzpatrick, M.A. Brewer, K.O. Obeng-Boampong, E. Park, N.D. Trout | February 2009 |
Developing a Work Zone Safety and Mobility Performance Monitoring Plan for Texas | 0-5771-S | G.L. Ullman, R.J. Porter, G.J. Karkee | February 2009 |
Establishing Advisory Speeds on Non Direct-Connect Ramps: Technical Report | 0-6035-1 | S.P. Venglar, R.J. Porter, K.O. Obeng-Boampong, s. Kuchangi | February 2009 |
Speeds in School Zones: Appendix A | 0-5470-1-Appendix A | K. Fitzpatrick, M.A. Brewer, K.O. Obeng-Boampong, E. Park, N.D. Trout | February 2009 |
Updated Work Zone Capacities | 0-5619-S | D.W. Borchardt, G. Pesti, D. Sun, L. Ding | February 2009 |
Analysis and Integration of Spatial Data for Transportation Planning | 0-5696-1 | C.A. Quiroga, Y. Li, N.A. Koncz, J.H. Overman | June 2009 |
An Assessment of Frontage Road Yield Treatment Effectiveness | 0-4986-S | R.H. Henk, K.O. Obeng-Boampong | March 2009 |
Utility Installation Review System - Implementation Report | 5-2110-03-2 | C.A. Quiroga, Y. Li, J.T. Le, E. Kraus | March 2009 |
Development of Frontage Road Yield Treatment Analysis Tool (FRYTAT) Database Software | 0-4986-2 | K.O. Obeng-Boampong, L. Ding, R.H. Henk, M.Y. Garcia | March 2009 |
Monitoring Work Zone Safety and Mobility Impacts in Texas | 0-5771-1 | G.L. Ullman, R.J. Porter, G.J. Karkee | May 2009 |
Utility Installation Review System - 2008 Follow-up Report | 5-2110-03-4 | C.A. Quiroga, J.T. Le, Y. Li | November 2009 |
Implementation Guide for Monitoring Work Zone Safety and Mobility Impacts | 0-5771-P1 | G.L. Ullman, R.J. Porter, G.J. Karkee | September 2009 |
Capacity and Road User Cost Analysis of Selected Freeway Work Zones in Texas | 0-5619-1 | D.W. Borchardt, G. Pesti, D. Sun, L. Ding | September 2009 |
Right of Way Real Property Asset Management - Prototype Data Architecture | 0-5788-1 | C.A. Quiroga, E. Kraus, N.A. Koncz, S. Lyle, Y. Li | 2009 |
Comprehensive Guide to Traffic Control Near Schools | 0-5470-S | K. Fitzpatrick, M.A. Brewer, K.O. Obeng-Boampong, E. Park, N.D. Trout | August 2008 |
In-Service Evaluation of Cable Median Barrier Performance | 0-5609-S | S.A. Cooner, D.C. Alberson, R.P. Bligh, S.E. Ranft, Y.K. Rathod, D. Sun | August 2008 |
Cable Median Barrier Maintenance Manual | 0-5609-P1 | S.A. Cooner, Y.K. Rathod, D. Sun, S.E. Ranft | August 2008 |
Establishing Advisory Speeds on Non-Direct Connect (Regular/Slip) Ramps | 0-6035-S | S.P. Venglar, R.J. Porter, K.O. Obeng-Boampong, S.P. Kuchangi | December 2008 |
Engineering Design Data Management - Practices and Framework Development | 0-5246-1 | C.A. Quiroga, N.A. Koncz | February 2008 |
Managed Lane Strategies Feasible for Freeway Ramp Applications | 0-5284-2 | B.T. Kuhn, K.N. Balke, N.A. Chaudhary, D.L. Jasek, G.J. Karkee, K.O. Obeng-Boampong, J.A. Shelton, S.P. Venglar | January 2008 |
Hurricane Evacuation Traffic Operations | 0-4962-1 | A.J. Ballard, B.R. Ullman, N.D. Trout, S.P. Venglar, D.W. Borchardt, A.P. Voigt, K.O. Obeng-Boampong, R. Rajbhandari | March 2008 |
An Assessment of Yield Treatments at Frontage Road-Exit Ramp and Frontage Road-U-Turn Merge Areas | 0-4986-1 | K.O. Obeng-Boampong, L. Ding, R.H. Henk, J.C. Williams, P. Vo | November 2008 |
Utility Installation Review (UIR) System Training Materials | 5-2110-03-P2 | C.A. Quiroga, Y. Li, J.T. Le | October 2008 |
Developing a Statewide, Integrated GIS/GPS Data Model | 0-5696-S | C.A. Quiroga, Y. Li, N.A. Koncz, J.H. Overman | 2008 |
Collection, Integration and Analysis of Utility Data in the Transportation Project Development Process | 0-5475-S | E. Kraus, C.A. Quiroga, N.A. Koncz, J.T. Le | 2008 |
ROW Real Property Asset Management Architecture | 0-5788-S | C.A. Quiroga, E. Kraus, N.A. Koncz, S. Lyle, Y. Li | 2008 |
Development of Guidelines for Hurricane Evacuation Signing and Markings | 0-4962-S | A.J. Ballard, B.R. Ullman, N.D. Trout, S.P. Venglar, D.W. Borchardt, A.P. Voigt, K.O. Obeng-Boampong, R. Rajbhandari | 2008 |
Analytical Enhancements to PASSER V for Arterial and Access Management | 0-5424-S | N.A. Chaudhary, C. Chu, S.R. Sunkari, S.P. Venglar | August 2007 |
Guidelines for Hurricane Evacuation Signing and Markings | 0-4962-P1 | B.R. Ullman, N.D. Trout, A.J. Ballard | December 2007 |
Data Model and Guidelines for Managing Engineering Design Data in a GIS Environment | 0-5246-S | C.A. Quiroga, N.A. Koncz, E. Kraus, J.T. Le, K. Hamad, R. Rajbhandari | December 2007 |
Guidelines for Applying Managed Lane Strategies to Ramps | 0-5284-P1 | B.T. Kuhn, K.N. Balke, N.A. Chaudhary, D.L. Jasek, G.J. Karkee, K.O. Obeng-Boampong, J.A. Shelton, S.P. Venglar | December 2007 |
Development of a Utility Conflict Management Tool | 0-5475-1 | E. Kraus, C.A. Quiroga, R.M. Brown, C.R. Stevens, N.A. Koncz | January 2007 |
Ramp Reversal Projects: Guidelines for Successful Implementation | 0-5105-1 | S.A. Cooner, S.P. Venglar, Y.K. Rathod, E.J. Pultorak, J.C. Williams, P. Vo, S. Mattingly | July 2007 |
Feasibility and Guidelines for Applying Managed Lane Strategies to Ramps | 0-5284-S | B.T. Kuhn, K.N. Balke, N.A. Chaudhary, D.L. Jasek, G.J. Karkee, K.O. Obeng-Boampong, J.A. Shelton, S.P. Venglar, R. Cheu | November 2007 |
Applying Techniques to Increase Warning of Signals Beyond Vertical Curves | 5-4084-01-1 | S.P. Venglar, K.O. Obeng-Boampong | October 2007 |
Development of Guidelines for Ramp Reversal Projects | 0-5105-S | S.A. Cooner, S.P. Venglar, E.J. Pultorak, Y.K. Rathod, J.C. Williams, P. Vo, S. Mattingly | December 2006 |
Recommended Practices for Hurricane Evacuation Traffic Operations | 0-4962-P2 | A.J. Ballard, D.W. Borchardt | May 2006 |
Strategies for Separating Trucks from Passenger Vehicles: Truck Facility Guidebook | 0-4663-P1 | D.R. Middleton, S.P. Venglar, C.A. Quiroga, D. Lord | October 2006 |
Strategies for Separating Trucks from Passenger Vehicles: Final Report | 0-4663-2 | D.R. Middleton, S.P. Venglar, C.A. Quiroga, D. Lord, D.L. Jasek | 2006 |
Strategies for Separating Trucks from Passenger Vehicle Traffic | 0-4663-S | D.R. Middleton, S.P. Venglar, C.A. Quiroga, D. Lord | August 2005 |
Improving Safety and Operations of Traffic Signals Near Railroad Grade Crossings with Active Warning Devices | 0-4265-S | K.N. Balke, R.J. Engelbrecht, S.R. Sunkari, S.P. Venglar | December 2005 |
Improving Driver Perception of Signals near Vertical Curves | 0-4084-S | P.A. Barricklow, M.S. Jacobson | February 2005 |
Guidelines for Vehicle Lane Restrictions in Texas | 0-4761-S | D.W. Borchardt, D.L. Jasek, A.J. Ballard | May 2005 |
Managed Lanes Handbook | 0-4160-24 | B.T. Kuhn, V.D. Goodin, A.J. Ballard, M.A. Brewer, R.E. Brydia, J.L. Carson, S.T. Chrysler, T.S. Collier, K. Fitzpatrick, D.L. Jasek, C.M. Dusza, G.L. Ullman | October 2005 |
Engineering Solutions to Improving Operations and Safety at Signalized Intersections near Railroad Grade Crossings with Active Devices | 0-4265-1 | R.J. Engelbrecht, K.N. Balke, S.R. Sunkari, S.P. Venglar | September 2005 |
Findings from Texas: Five Years of Research on Managed Lanes | 0-4160-25 | B.T. Kuhn, V.D. Goodin, A.J. Ballard, M.A. Brewer, R.E. Brydia, J.L. Carson, S.T. Chrysler, T.S. Collier, W.L. Eisele, D.W. Fenno, K. Fitzpatrick, G.L. Ullman, S.P. Venglar | September 2005 |
Incident Management for Managed Lanes | 0-4160-17 | A.J. Ballard | December 2004 |
Methodology for Determination of Optimal Traffic Responsive Plan Selection Control Parameters | 0-4421-1 | M.M. Abbas, N.A. Chaudhary, A. Sharma, S.P. Venglar, R.J. Engelbrecht | February 2004 |
Operations and Safety Around Schools: Overview of Project Activities and Findings | 0-4286-3 | S.A. Cooner, K. Fitzpatrick, M.D. Wooldridge, J.A. Crawford, G.L. Ford | January 2004 |
Traffic Operations and Safety at Schools: Recommended Guidelines | 0-4286-2 | S.A. Cooner, K. Fitzpatrick, M.D. Wooldridge, G.L. Ford | January 2004 |
Summary of Guidelines for Roadway Facilities Around Schools | 0-4286-S | S.A. Cooner, K. Fitzpatrick, M.D. Wooldridge, G.L. Ford | June 2004 |
Urban Freeway Signing and the Freeway Signing Handbook | 0-4170-S | H.G. Hawkins, Jr., G.L. Ford, S.T. Chrysler | May 2004 |
Utility Installation Review System - Progress Report | 5-2110-03-1 | C.A. Quiroga, R.J. Pina, D.R. Dennis, S. Sunkari | October 2004 |
Guidelines for the Use of Countermeasures to Reduce Crashes on Approaches to Signalized Intersections Near Vertical Curves | 0-4084-P1 | P.A. Barricklow, M.S. Jacobson | September 2004 |
Improving Safety at Signalized Intersections near Vertical Curves | 0-4084-1 | P.A. Barricklow, M.S. Jacobson, D. Lord | September 2004 |
Guidelines for Using Decision Sight Distance at Signalized Intersections near Vertical Curves | 0-4084-P2 | P.A. Barricklow, M.S. Jacobson | September 2004 |
Signal Optimization and Analysis Using Passer V - Training Workshop | 5-4020-01-P1 | N.A. Chaudhary, S.P. Venglar, C. Chu | September 2004 |
Monitoring of Texas Vehicle Lane Restrictions | 0-4761-1 | D.W. Borchardt, D.L. Jasek, A.J. Ballard | September 2004 |
Year 4 Annual Report of Progress: Operating Freeways with Managed Lanes | 0-4160-19 | B.T. Kuhn, V.D. Goodin, A.J. Ballard, R.E. Brydia, S.T. Chrysler, T.S. Collier, A.S. Cothron, W.L. Eisele, D.W. Fenno, K.M. Fitzpatrick, S.Y. Song, G.L. Ullman, S.P. Venglar | September 2004 |
Managed Lane Ramp and Roadway Design Issues | 0-4160-10 | K. Fitzpatrick, M.A. Brewer, S.P. Venglar | January 2003 |
Urban Freeway Guide Signing: Final Report | 0-4170-2 | H.G. Hawkins, Jr., S.T. Chrysler, G.L. Ford | October 2003 |
Improving Work Zone Safety Using Traffic Management and Enforcement Tools | 0-2137-S | G.L. Ullman, P.A. Barricklow, R. Arredondo, E.R. Rose, M.D. Fontaine | October 2003 |
Interim Manual for Managed Lanes | 0-4160-14 | B.T. Kuhn, V.D. Goodin, M.A. Brewer, T.S. Collier, K. Fitzpatrick, D.L. Jasek, S.P. Venglar | October 2003 |
GIS-Based Assessment of Highway Network, Crash, and Traffic Volume Data in the Laredo-Nuevo Laredo Area | SWUTC/03/167426-1 | C.A. Quiroga, R.J. Pina, M.A. Perez | October 2003 |
Year 3 Annual Report of Progress: Operating Freeways with Managed Lanes | 0-4160-15 | B.T. Kuhn, V.D. Goodin, S.T. Chrysler, T.S. Collier, A.S. Cothron, W.L. Eisele, D.W. Fenno, K. Fitzpatrick, G.L. Ullman, S.P. Venglar | September 2003 |
Freeway Guide Signing: Review of Past Research | 0-4170-1 | M.D. Fontaine, S.T. Chrysler, G.L. Ford, H.G. Hawkins, Jr. | April 2002 |
Summary Report on Improving Diamond Interchange Operations Using Advanced Controller Features | 4158-S | R.J. Engelbrecht, S.P. Venglar, Z. Tian | April 2002 |
The Preempt Trap: How to Make Sure You Do Not Have One | 0-1752-9 | R.J. Engelbrecht, S.R. Sunkari, T. Urbanik, S.P. Venglar, K.N. Balke | March 2002 |
Traffic Operations and Safety At Schools: Review of Existing Guidelines | 0-4286-1 | S.A. Cooner, K. Fitzpatrick, M.D. Wooldridge, J.A. Crawford, G.L. Ford | October 2002 |
Managed Lanes - Traffic Modeling | 0-4160-4 | S.P. Venglar, D.W. Fenno, S. Goel, P.A. Schrader | October 2002 |
Year 2 Annual Report of Progress: Operating Freeways with Managed Lanes | 0-4160-12 | B.T. Kuhn, V.D. Goodin, T.S. Collier, A.S. Cothron, W.L. Eisele, K. Fitzpatrick, S.P. Venglar | September 2002 |
Measuring and Improving Incident Response | 4907-S | K.N. Balke, S.A. Cooner, B.R. Durkop, D.W. Fenno, R. Arredondo | January 2001 |
Research Report on Improving Diamond Interchange Operations Using Advanced Controller Features | 4158-1 | R.J. Engelbrecht, S.P. Venglar, Z. Tian | October 2001 |
Feasibility of Portable Traffic Signals to Replace Flaggers in Maintenance Operations | 7-3926-1 | Daniels, V.F., S.P. Venglar, D.L. Picha | February 2000 |
Guidelines for the Use of Portable Traffic Signals in Rural Two-Lane Maintenance Operations | 7-3926-2 | Daniels, V.F., S.P. Venglar, D.L. Picha | February 2000 |
Feasibility of Portable Traffic Signals to Replace Flaggers in Maintenance Operations | 7-3926-S | Daniels, V.F., S.P. Venglar, D.L. Picha | March 2000 |
Driver Education Needs and Materials Concerning Traffic Control Devices | 0-1794-S | A.H. Parham, G.L. Ford, S.R. Hulett | November 2000 |
Guide for Traffic Signal Preemption Near Railroad Grade Crossing | 1439-9 | S.P. Venglar, M.S. Jacobson, S.R. Sunkari, R.J. Engelbrecht, T. Urbanik | September 2000 |
Updating Educational Materials on Traffic Control Devices | 0-1794-3 | A.H. Parham, G.L. Ford, S.R. Hulett | September 2000 |
Summary of Highway/Rail Intersection Research at the Texas A&M University ITS Research Center of Excellence | RCE-99/02 | J.W. Webb, R.E. Bartoskewitz, H.A. Richards, S.P. Venglar, D. Bullock, T. Urbanik | April 1999 |
Evaluation of Alternative Traffic Signs for Use in Texas Border Areas | 1274-3 | H.G. Hawkins, Jr., D.L. Picha, D.C. Kreis, M.A. Knodler | March 1999 |
Recommendations to Improve Driver Education on Traffic Control Devices | 0-1794-1 | D.L. Picha, G.L. Ford, A.H. Parham | May 1999 |
Legibility Comparison of Three Freeway Guide Sign Alphabets | 1276-1F | H.G. Hawkins, Jr., M.D. Wooldridge, A.B. Kelly, D.L. Picha, F.K. Greene | May 1999 |
Driver Behavior Characteristics of Teenage Drivers and Older Drivers | 0-1794-2 | A.H. Parham, G.L. Ford | November 1999 |
Development of Improved Guidelines for Frontage Road Driveway Access at Entrance Ramp Locations | 2927-2 | M.S. Jacobson, R. Arredondo, R.H. Henk | October 1999 |
Assessment of Existing and Alternative Traffic Control Devices in Texas Border Areas | TRB 991401 | D.L. Picha, H.G. Hawkins, Jr., C.A. Lopez | 1999 |
Assessment of Existing and Alternative Traffic Control Devices in Texas Border Areas | 1274-2 | D.L. Picha, H.G. Hawkins, Jr., A.K. Vizcarra, R.A. Donovan | February 1998 |
Driver Speed vs. Crash Risk: Pilot Study Summary | TTI-1998-3 | J.H. Ogle, O.J. Pendleton, L.I. Griffin, P.J. Carlson | March 1998 |
Investigation of Sources of Freeway Speed Data in the Dallas Area and Presentation to Traveling Public by Electronic Means | 7-3973-S | J.D. Carvell, C.J. Pierce, J.H. Ogle | November 1998 |
Assessment of Travel Characteristics Required for the Development of an In-Vehicle Advanced Traveler Information System | 7-2939-S | J.H. Ogle, S.M. Turner, J. Baumgartner, R.H. Henk | September 1998 |
Assessment of Travel Characteristics Required for the Development of an In-Vehicle Advanced Traveler Information System | 7-2939-1 | J.H. Ogle, S.M. Turner, J. Baumgartner, R.H. Henk | September 1998 |
Guidelines for Truck Lane Restrictions in Texas | 1726-S | D.L. Jasek, M. Shafer, D.L. Picha, T. Urbanik | August 1997 |
Evaluation of Innovative Coordination Methods Utilizing ITS Technology for Traffic Signals | 7-2971-S | S.P. Venglar | October 1997 |
A Methodology for Determining Economic Impacts of Raised Medians: Initial Development | 7-3904-1 | W.L. Eisele, W.E. Frawley, D.L. Picha, M.T. Wildenthal | October 1997 |
Before-and-After Analysis of Advanced Transportation Management Systems | 1467-3 | R.H. Henk, M.E. Molina, S.P. Venglar | September 1997 |
Assessment of Sign Vandalism in the State of Texas | 1467-1 | C.R. McIlroy, D.L. Picha, H.G. Hawkins, Jr. | August 1996 |
Texas Department of Transportation Intelligent Transportation Systems Deployment Strategy | 0-1467 | W.R. Stockton, S.P. Venglar | May 1996 |
Assessment of Mexican Driver Understanding of Existing Traffic Control Devices Used in Texas | 1274-1 | H.G. Hawkins, Jr., D.L. Picha, B.L. Mann, C.R. McIlroy, K.N. Womack, C.L. Dudek | November 1996 |
Real-Time Assessment and Use of Arterial Street Capacity for Freeway Diversion Routing | 2978-1F | K.S. Rao, S.P. Venglar, R. Sarma, V. Bogarapu | October 1996 |
Traffic Control Devices at Two-Way Stop-Controlled Intersections | 1374-1F | D.L. Picha, C.E. Schuckel, A. Parham, C.T. Mai | 1996 |
Real-Time, Multimodal Traffic-Adaptive Diamond Interchange Control System: Laboratory Demonstration | TTI/ITS RCE-95/01 | S.P. Venglar, T. Urbanik | June 1995 |
Motorist Understanding of Alternative Designs for Traffic Signs | 1261-5F | D.L. Picha, H.G. Hawkins, Jr., K.N. Womack | November 1995 |
1992 Transportation Engineering Research Reports | SWUTC/94/712410-5 | K.M. Collins, B.P. Cronin, J.L. DeSanta, G.A. Hanks, A.R. Kohls, G.D. Krueger, M.T. Lance, M. Luszcz, R.L. Nowlin, D.L. Picha, J. Ricci, T.A. Thomason, J. Van Arendonk, D. Williams | August 1994 |
Development of Analytical Tools for Evaluating Operations of Light Rail at Grade Within an Urban Signal System - Interim Report 2 | 1278-2 | S.P. Venglar, D.B. Fambro, C.H. Walters | July 1994 |
Development of Analytical Tools for Evaluating Operations of Light Rail at Grade Within an Urban Signal System - Final Report | 1278-4F | S.P. Venglar, D.B. Fambro, C.H. Walters | November 1994 |
Development of Analytical Tools for Evaluating Operations of Light Rail at Grade within an Urban Signal System - Interim Report | 1278-1 | C.H. Walters, S.P. Venglar, D.B. Fambro, J.R. Daniel | July 1993 |
Analysis of Urban Freeway Operations and Modifications | 210-12F | D.W. Borchardt, A.J. Ballard, W.R. Stockton | December 1984 |
Utility Engineering
Title | Report Number | Author(s) | Date |
---|---|---|---|
0-7053: Quantifying the Valuation of Right-of-Way | 0-7053-PSR | E. Kraus, W.A. Holik, P. Anderson, C.A. Quiroga, S.M. Trojacek | August 2023 |
Valuation Methodology and Framework for Estimation of Right-of-Way Value | 0-7053-R1 | E. Kraus, W.A. Holik, P. Anderson, C.A. Quiroga, S.M. Trojacek | August 2023 |
Sequencing and Placement of Noise Walls and Retaining Walls on TxDOT Projects | 0-7014-R1 | K. Harbin, E. Kraus, B. Huch, K. Ferrell | April 2022 |
A Guide for Sequencing and Placement of Noise Walls and Retaining Walls on TxDOT Projects | 0-7014-P1 | K.B. Harbin, E. Kraus | March 2022 |
0-7014: Sequencing and Placement of Noise Walls and Retaining Walls on Complex TxDOT Projects | 0-7014-PSR | K.B. Harbin, E. Kraus, B. Huch, K.M. Ferrell | March 2022 |
Using Unmanned Aircraft Systems for Crash Reconstructions During Suboptimal Conditions | 0-7063-R1 | C.A. Quiroga, M.J. Starek, J. Maldonado, E. Kraus, S. Taylor, Y. Ham, T. Chu | October 2021 |
Guidance for the Use of UAS during Suboptimal Environmental Conditions | 0-7063-PSR | C.A. Quiroga, M.J. Starek, J. Maldonado, E. Kraus, S. Taylor, Y. Ham, T. Chu | October 2021 |
Engineering Guidelines for Installing Temporary Lines within the Right of Way | 0-6886-PSR | C.A. Quiroga, W.A. Holik, J. Li, I. Tsapakis, D.H. Bierling | June 2019 |
Guidelines for Installing, Operating, and Maintaining Temporary Saltwater Pipelines | 0-6886-P1 | C.A. Quiroga, W.A. Holik, J. Li | June 2019 |
Temporary Saltwater Pipelines: Current Practice and Recommendations | 0-6886-R1 | C.A. Quiroga, W.A. Holik, J. Li, I. Tsapakis, D.H. Bierling | June 2019 |
Statewide Implementation of Innovative Safety Analysis Tools in Identifying Highway Safety Improvement Projects | 5-6912-01-PSR | I. Tsapakis, W.A. Holik, S.R. Geedipally, S.S. Samant, K.K. Dixon | November 2019 |
Statewide Implementation of Innovative Safety Analysis Tools in Identifying Highway Safety Improvement Projects: Technical Report | 5-6912-01-R1 | I. Tsapakis, W.A. Holik, S.R. Geedipally, S.S. Samant, K.K. Dixon | October 2019 |
Innovative Tools and Techniques in Identifying Highway Safety Improvement Projects | 0-6912-S | I. Tsapakis, K.K. Dixon, J. Li, B. Dadashova, W.A. Holik, S. Sharma, S.R. Geedipally, J.T. Le | August 2017 |
Innovative Tools and Techniques in Identifying Highway Safety Improvement Projects: Technical Report | 0-6912-1 | I. Tsapakis, K.K. Dixon, J. Li, B. Dadashova, W.A. Holik, S. Sharma, S.R. Geedipally, J.T. Le | August 2017 |
Management of Real Property Acquisition Activities at TxDOT | 0-6892-1 | C.A. Quiroga, I. Tsapakis, E. Kraus, W.A. Holik | February 2017 |
Integration of Right of Way Project Schedules for Decision-Making Purposes | 0-6892-S | C.A. Quiroga, I. Tsapakis, E. Kraus, W.A. Holik, J.H. Overman, D. Kang | February 2017 |
TTI San Antonio Office | C.A. Quiroga | 2017 | |
Maximizing Mitigation Benefits: Research to Support a Mitigation Cost Framework - Final Report | 0-6762-01-1 | K.M. Miller, M. Miller, J.H. Overman, E. Kraus | August 2016 |
Truck Axle Weight Distributions | C.A. Quiroga, J. Li, J.T. Le | July 2016 | |
Descriptive Statistics and Well County Maps | C.A. Quiroga, I. Tsapakis, W.A. Holik | June 2016 | |
Traffic Loads for Developing and Operating Individual Wells | C.A. Quiroga, E. Kraus, I. Tsapakis | June 2016 | |
Traffic Loads for Segment and Corridor-Level Analyses | C.A. Quiroga, J. Li | June 2016 | |
Maximizing Mitigation Benefits | 0-6762-01-S | J.H. Overman, K.M. Miller, M. Miller, E. Kraus | 2016 |
Texans Talk Transportation: Development of an Online Community, Phase I | PRC 15-42-F | B.L. Ettelman, T.S. Geiselbrecht, J.R. Trendler, G. Stoeltje, E. Kraus | July 2015 |
Oil and Gas Energy Developments and Changes in Pavement Conditions in Texas | PRC 14-35F | C.A. Quiroga, I. Tsapakis, E. Kraus, J.T. Le, A.J. Wimsatt | March 2015 |
Comprehensive Transportation and Energy Systems (CTEs) - Strategic Research Roadmap | TTI/SRP/15/161503-1 | C.A. Quiroga | November 2015 |
Oil and Gas Energy Developments and Changes in Crash Trends in Texas | PRC 15-35 F | C.A. Quiroga, I. Tsapakis | October 2015 |
Maximizing Mitigation Benefits - Making a Difference with Strategic Inter-Resource Agency Planning: Year One Technical Report | 0-6762-1 | J.H. Overman, B.J. Storey, E. Kraus, K.M. Miller, J.A. Walewski, Z. Elgart, S. Atkinson | April 2014 |
Maximizing Mitigation Benefits--Making a Difference with Strategic Inter-Resource Agency Planning: Year Two Technical Report | 0-6762-2 | J.H. Overman, B.J. Storey, E. Kraus, K.M. Miller, J.A. Walewski, Z. Elgart, S. Atkinson | November 2014 |
Introductory Guide to Integrated Ecological Framework | 0-6762-P1 | J.H. Overman, B.J. Storey, E. Kraus, K.M. Miller, Z. Elgart | October 2014 |
Evaluation of Costs to Process and Manage Utility and Driveway Permits | 0-6756-1 | C.A. Quiroga, S. Sharma, M.E. Meyland | October 2014 |
Maximizing Mitigation Benefits-Making a Difference with Strategic Inter-Resource Agency Planning | 0-6762-S | J.H. Overman, B.J. Storey, E. Kraus, K.M. Miller, J.A. Walewski, Z. Elgart, S. Atkinson | 2014 |
Determine the Cost for TxDOT to Process/Review/Approve Utility and Driveway Permits | 0-6756-S | C.A. Quiroga, S. Sharma, M.E. Meyland | 2014 |
Utility Investigation Best Practices and Effects on TxDOT Highway Improvement Projects | 0-6631-1 | E. Kraus, Y. Li, J.H. Overman, C.A. Quiroga | April 2013 |
Optimizing Utility Owner Participation in the Project Development and Delivery Process | 0-6624-1 | C.A. Quiroga, Y. Li, E. Kraus, J.T. Le | April 2013 |
TxDOT Administration Research: Tasks Completed FY 2012 | 0-6581-TI-4 | S.A. Cooner, J.A. Crawford, J.A. Epps, E.G. Fernando, M.Q. Le, D.E. Newcomb, C.M. Poe, C.A. Quiroga, Y.K. Rathod, E.J. Seymour, W.R. Stockton, A.J. Wimsatt | August 2013 |
Best Practices for Utility Investigations in the TxDOT Project Development Process | 0-6631-S | E. Kraus, Y. Li, J.H. Overman, C.A. Quiroga | 2013 |
Geodatabase of Energy Developments in Texas | 0-6498-P1 | C.A. Quiroga | February 2012 |
Synthesis of TxDOT Uses of Real-Time Commercial Traffic Data | 0-6659-1 | D.R. Middleton, R. Rajbhandari, R.E. Brydia, P. Songchitruksa, E. Kraus, S. Hernandez, K. Cheu, V. Iragavarapu, S.M. Turner | January 2012 |
TxDOT Uses of Real-Time Commercial Traffic Data: Opportunity Matrix | 0-6659-P1 | D.R. Middleton, R. Rajbhandari, R.E. Brydia, P. Songchitruksa, E. Kraus, S. Hernandez, K. Cheu, V. Iragavarapu, S.M. Turner | January 2012 |
Energy Developments and the Transportation Infrastructure in Texas: Impacts and Strategies | 0-6498-1 | C.A. Quiroga, E.G. Fernando, J.H. Oh | March 2012 |
Strategies to Encourage and Facilitate Utility Owner Participation in Transportation Projects: Guidebook and Training Materials | 0-6624-P1 | C.A. Quiroga, E. Kraus, Y. Li, J.T. Le | November 2012 |
Instructor's and Student's Training Materials and Guidebook | 0-6631-P1 | E. Kraus | November 2012 |
Improving the Response and Participation by Utility Owners in the Project Development Process | 0-6624-S | C.A. Quiroga, Y. Li, E. Kraus, J.T. Le | 2012 |
Texas Energy Developments and TxDOT Right of Way | 0-6498-S | C.A. Quiroga, E.G. Fernando, J.H. Oh | 2012 |
Evaluating the Impact of Overweight Load Routing on Buried Utility Facilities | 0-6394-2 | E. Kraus, J.H. Oh, E.G. Fernando, E. Li, C.A. Quiroga, N.A. Koncz | December 2011 |
Evaluating the Impact of Overweight Load Routing on Buried Utility Facilities | 0-6394-1 | E. Kraus, E.G. Fernando, Y. Li, J.H. Oh, N.A. Koncz, C.A. Quiroga | February 2011 |
Use of Existing Information Systems and Data to Support Bridge Management at TxDOT | 0-6389-P1 | C.A. Quiroga, N.A. Koncz, J.T. Le, Y. Li, A.J. Wimsatt | February 2011 |
Framework for a Comprehensive Bridge Management and Information System | 0-6389-1 | C.A. Quiroga, J. Weissmann, N.A. Koncz, J.T. Le, Y. Li, A.J. Wimsatt | November 2011 |
Framework for Comprehensive Bridge Management and Information System (BMIS) | 0-6389-S | A.J. Wimsatt, C.A. Quiroga, J. Weissmann, N.A. Koncz, J.T. Le, Y. Li | 2011 |
Evaluation of Overweight Load Routing on Buried Utility Plant | 0-6394-S | E. Kraus, J.H. Oh, E.G. Fernando, Y. Li, C.A. Quiroga, N.A. Koncz | 2011 |
S2-R15B-RW-1: Identification of Utility Conflicts and Solutions: Training Materials | C.A. Quiroga, E. Kraus, P. Scott, T. Swafford, P.J. Meis | 2011 | |
Synthesis of TxDOT Uses of Real-Time Commercial Traffic Routing Data | 0-6659-S | D.R. Middleton, R. Rajbhandari, R.E. Brydia, P. Songchitruksa, V. Iragavarapu, E. Kraus, S.M. Turner, S. Hernandez, K. Cheu | 2011 |
Integrating Utility Conflict Elimination and Environmental Processes | 0-6065-S | C.A. Quiroga, E. Kraus, J.H. Overman, N.A. Koncz | February 2010 |
Integration of Utility and Environmental Activities in the Project Development Process | 0-6065-1 | C.A. Quiroga, E. Kraus, J.H. Overman, N.A. Koncz | January 2010 |
Swim Lane Diagrams | 0-6065-P2 | C.A. Quiroga | May 2010 |
Strategies and Recommendations for Integrating Utility and Environmental Processes at TxDOT | 0-6065-P1 | C.A. Quiroga, E. Kraus, J.T. Le | May 2010 |
Estimated Impacts of the 2010 Census on the Texas Transit Funding Formula | 0-6199-1 | K. Eschbach, M. Cline, L.K. Cherrington, A.S. Edrington, P.L. Ellis, E. Kraus | September 2010 |
Feasibility and Applications of RFID Technologies to Support Right-of-Way Functions | 0-6142-S | H.G. Hawkins, Jr., A. Lodgher, J. Perkins, Y. Yang, E. Jones, C.A. Quiroga | 2010 |
Estimated Impacts of the 2010 Census on the Texas Transit Funding Formula | 0-6199-S | L.K. Cherrington, K. Eschbach, M. Cline, A.S. Edrington, P.L. Ellis, E. Kraus | 2010 |
Utility Accommodation and Conflict Tracker (UACT): User Manual | 0-5475-3 | E. Kraus, H. Dawood | April 2009 |
Prototype Utility Conflict Data Management System, Beta Version | 0-5475-P2 | E. Kraus | April 2009 |
Development of a Utility Conflict Management System | 0-5475-4 | E. Kraus, C.A. Quiroga, N.A. Koncz, H. Dawood | April 2009 |
Utility Accommodation and Conflict Tracker (UACT) Installation and Configuration Manual | 0-5475-2 | E. Kraus, J.T. Le, H. Dawood | April 2009 |
Analysis and Integration of Spatial Data for Transportation Planning | 0-5696-1 | C.A. Quiroga, Y. Li, N.A. Koncz, J.H. Overman | June 2009 |
Utility Installation Review System - Implementation Report | 5-2110-03-2 | C.A. Quiroga, Y. Li, J.T. Le, E. Kraus | March 2009 |
Utility Installation Review System - 2008 Follow-up Report | 5-2110-03-4 | C.A. Quiroga, J.T. Le, Y. Li | November 2009 |
Right of Way Real Property Asset Management - Prototype Data Architecture | 0-5788-1 | C.A. Quiroga, E. Kraus, N.A. Koncz, S. Lyle, Y. Li | 2009 |
Engineering Design Data Management - Practices and Framework Development | 0-5246-1 | C.A. Quiroga, N.A. Koncz | February 2008 |
Inventory of Utilities - Summary Report | 5-2110-01-4 | C.A. Quiroga, K. Hamad, E. Kraus | January 2008 |
Utility Installation Review (UIR) System Training Materials | 5-2110-03-P2 | C.A. Quiroga, Y. Li, J.T. Le | October 2008 |
ROW Real Property Asset Management Architecture | 0-5788-S | C.A. Quiroga, E. Kraus, N.A. Koncz, S. Lyle, Y. Li | 2008 |
Developing a Statewide, Integrated GIS/GPS Data Model | 0-5696-S | C.A. Quiroga, Y. Li, N.A. Koncz, J.H. Overman | 2008 |
Collection, Integration and Analysis of Utility Data in the Transportation Project Development Process | 0-5475-S | E. Kraus, C.A. Quiroga, N.A. Koncz, J.T. Le | 2008 |
Data Model and Guidelines for Managing Engineering Design Data in a GIS Environment | 0-5246-S | C.A. Quiroga, N.A. Koncz, E. Kraus, J.T. Le, K. Hamad, R. Rajbhandari | December 2007 |
Specification Framework for Communication Utilities and Estimation of Utility Adjustment Costs | 0-4998-3 | C.A. Quiroga, D. Ford, T.R. Taylor, S. Kranc, E. Kraus, E. Park | December 2007 |
Development of a Utility Conflict Management Tool | 0-5475-1 | E. Kraus, C.A. Quiroga, R.M. Brown, C.R. Stevens, N.A. Koncz | January 2007 |
A Unit Cost and Construction Specification Framework for Utility Installations | 0-4998-1 | C.A. Quiroga, S. Kranc, D. Ford, E. Kraus, T.R. Taylor | March 2007 |
Transportation Operations Data Needs and Recommendations for Implementation | 0-5257-1 | C.A. Quiroga, K. Hamad, R.E. Brydia, R. Rajbhandari, R.J. Benz, S.R. Sunkari | March 2007 |
Construction Specification Requirements for Water and Sanitary Sewer Installations | 0-4998-2 | C.A. Quiroga, S. Kranc, D. Ford, E. Kraus, T.R. Taylor | March 2007 |
Standardization of Special Provisions and Determination of Unit Costs for Utility Installations | 0-4998-S | C.A. Quiroga, D.N. Ford, T.R. Taylor, S. Kranc, E. Park | 2007 |
Strategies for Managing Transportation Operations Data | 0-5257-S | C.A. Quiroga, K. Hamad, R.E. Brydia, R. Rajbhandari, S.R. Sunkari, S.M. Turner, R.J. Benz | November 2006 |
Strategies for Separating Trucks from Passenger Vehicles: Truck Facility Guidebook | 0-4663-P1 | D.R. Middleton, S.P. Venglar, C.A. Quiroga, D. Lord | October 2006 |
Strategies for Separating Trucks from Passenger Vehicles: Final Report | 0-4663-2 | D.R. Middleton, S.P. Venglar, C.A. Quiroga, D. Lord, D.L. Jasek | 2006 |
Strategies for Separating Trucks from Passenger Vehicle Traffic | 0-4663-S | D.R. Middleton, S.P. Venglar, C.A. Quiroga, D. Lord | August 2005 |
Using Archived ITS Data to Optimize Incident Detection and Management | 0-4745-S | C.A. Quiroga, K. Hamad, E. Kraus, E. Park, R.J. Pina | December 2005 |
Work Zone Crash Influences on Texas Roadways | 0-4028-S | G.L. Ullman, S.D. Schrock, A.S. Cothron, E. Kraus, A.P. Voigt | May 2005 |
Incident Detection Optimization and Data Quality Control | 0-4745-3 | C.A. Quiroga, K. Hamad, E. Park | October 2005 |
Incident Evaluation Procedures and Implementation Requirements | 0-4745-2 | C.A. Quiroga, K. Hamad, E. Park | October 2005 |
An Analysis of Fatal Work Zone Crashes in Texas | 0-4028-1 | S.D. Schrock, G.L. Ullman, A.S. Cothron, E. Kraus, A.P. Voigt | October 2004 |
Utility Installation Review System - Progress Report | 5-2110-03-1 | C.A. Quiroga, R.J. Pina, D.R. Dennis, S. Sunkari | October 2004 |
Incident Characteristics and Impact on Freeway Traffic | 0-4745-1 | C.A. Quiroga, E. Kraus, R.J. Pina, K. Hamad, E. Park | October 2004 |
Red Light Running - A Policy Review | TTI-2003-6 | C.A. Quiroga, E. Kraus, I. van Schalkwyk, J.A. Bonneson | March 2003 |
GIS-Based Assessment of Highway Network, Crash, and Traffic Volume Data in the Laredo-Nuevo Laredo Area | SWUTC/03/167426-1 | C.A. Quiroga, R.J. Pina, M.A. Perez | October 2003 |
Truck Accommodation Design Guidance: Final Report | 0-4364-1 | D.R. Middleton, A. Clayton, C.A. Quiroga, D.L. Jasek | October 2003 |
Review and Evaluation of Enforcement Issues and Safety Statistics Related to Red-Light-Running | 0-4196-1 | J.A. Bonneson, K.H. Zimmerman, C.A. Quiroga | September 2003 |
Utilities in the Right-of-Way: Inventory and Data Management | 0-2110-S | C.A. Quiroga, C.D. Ellis, S. Shin, R.J. Pina | September 2003 |
A Data Platform for Managing Utilities Along Highway Corridors: User Manual | 0-2110-2 | C.A. Quiroga, C.D. Ellis, S. Shin, R.J. Pina | February 2002 |
A Data Platform for Managing Utilities Along Highway Corridors | 0-2110-1 | C.A. Quiroga, C.D. Ellis, S. Shin, R.J. Pina | February 2002 |
A GPS Based Approach for the Analysis of Car Following Behavior | Y. Hatipkarasulu, B. Wolshon, C.A. Quiroga | 1999 | |
Travel Time Information Using GPS and Dynamic Segmentation Techniques | C.A. Quiroga, D. Bullock | 1999 |