Begin typing a title, author, or keyword.
| Title | Report Number | Author(s) | Date |
|---|---|---|---|
| Utility Investigation Best Practices and Effects on TxDOT Highway Improvement Projects | 0-6631-1 | E. Kraus, Y. Li, J.H. Overman, C.A. Quiroga | April 2013 |
| Optimizing Utility Owner Participation in the Project Development and Delivery Process | 0-6624-1 | C.A. Quiroga, Y. Li, E. Kraus, J.T. Le | April 2013 |
| Integrated Prioritization Method for Active and Passive Highway-Rail Crossings | 0-6642-1 | A. Weissmann, J. Weissmann, J.L. Kunisetty, J.E. Warner, A.A. Protopapas, E. Park, S.P. Venglar, S. Sunkari | January 2013 |
| Instructor's and Student's Training Materials and Guidebook | 0-6631-P1 | E. Kraus | November 2012 |
| Strategies to Encourage and Facilitate Utility Owner Participation in Transportation Projects: Guidebook and Training Materials | 0-6624-P1 | C.A. Quiroga, E. Kraus, Y. Li, J.T. Le | November 2012 |
| Accommodating Oversize and Overweight Loads: Instructor and Student Guide | 0-6404-P2 | D.R. Middleton, Y. Li, J.T. Le | August 2012 |
| Accommodating Oversize and Overweight Loads: Technical Report | 0-6404-1 | D.R. Middleton, Y. Li, J.T. Le, N.A. Koncz | July 2012 |
| TxDOT Administration Research: Tasks Completed FY2011 | 0-6581-TI-3 | S. Anderson, C.P. Beaty, L. Ding, D.R. Ellis, J.A. Epps, C.K. Estakhri, B.A. Glover, M.L. Hoelscher, N.D. Norboge, R. Rajbhandari, T.L. Ramani, T. Scullion, J.A. Shelton, C. Shon, W.R. Stockton, S.R. Vadali, S.P. Venglar, J. Zietsman | April 2012 |
| Energy Developments and the Transportation Infrastructure in Texas: Impacts and Strategies | 0-6498-1 | C.A. Quiroga, E.G. Fernando, J.H. Oh | March 2012 |
| Geodatabase of Energy Developments in Texas | 0-6498-P1 | C.A. Quiroga | February 2012 |
| Synthesis of TxDOT Uses of Real-Time Commercial Traffic Data | 0-6659-1 | D.R. Middleton, R. Rajbhandari, R.E. Brydia, P. Songchitruksa, E. Kraus, S. Hernandez, K. Cheu, V. Iragavarapu, S.M. Turner | January 2012 |
| TxDOT Uses of Real-Time Commercial Traffic Data: Opportunity Matrix | 0-6659-P1 | D.R. Middleton, R. Rajbhandari, R.E. Brydia, P. Songchitruksa, E. Kraus, S. Hernandez, K. Cheu, V. Iragavarapu, S.M. Turner | January 2012 |
| Accommodating Oversize & Overweight Loads | 0-6404-S | D.R. Middleton, Y. Li, J.T. Le | 2012 |
| Evaluating the Impact of Overweight Load Routing on Buried Utility Facilities | 0-6394-2 | E. Kraus, J.H. Oh, E.G. Fernando, E. Li, C.A. Quiroga, N.A. Koncz | December 2011 |
| Framework for a Comprehensive Bridge Management and Information System | 0-6389-1 | C.A. Quiroga, J. Weissmann, N.A. Koncz, J.T. Le, Y. Li, A.J. Wimsatt | November 2011 |
| Prototype Decision-Making Software (web-based) | 0-6121-P1 | R.H. Henk, P. Songchitruksa, S.P. Venglar, G. Lim | November 2011 |
| Prototype Design for a Predictive Model to Improve Evacuation Operations: Technical Report | 0-6121-1 | R.H. Henk, P. Songchitruksa, S.P. Venglar, G. Lim | August 2011 |
| Operations and Safety of Super 2 Corridors with Higher Volumes | 0-6135-1 | M.A. Brewer, S.P. Venglar, L. Ding, K. Fitzpatrick, B. Park | June 2011 |
| Delivery of Pilot Workshop on Preserving and Enhancing the Functionality of Highways in Texas | 5-6208-01-1 | E.N. Hard, B.S. Bochner, Y. Li | March 2011 |
| Use of Existing Information Systems and Data to Support Bridge Management at TxDOT | 0-6389-P1 | C.A. Quiroga, N.A. Koncz, J.T. Le, Y. Li, A.J. Wimsatt | February 2011 |
| TxDOT Administration Research: Tasks Completed FY2010 | 0-6581-TI-2 | R.T. Baker, L. Ding, J. Epps, C.K. Estakhri, G. Fry, T.S. Geiselbrecht, V.D. Goodin, J.G. Hudson, T.J. Lomax, C.A. Morgan, J.P. Orsak, D.L. Schrank, T. Scullion, W.R. Stockton, S.P. Venglar, J.C. Villa, B.A. Wood, D.M. Winterich, R.E. Lee, J. Zietsman | February 2011 |
| Evaluating the Impact of Overweight Load Routing on Buried Utility Facilities | 0-6394-1 | E. Kraus, E.G. Fernando, Y. Li, J.H. Oh, N.A. Koncz, C.A. Quiroga | February 2011 |
| Real-Timing the 2010 Urban Mobility Report | UTCM 10-65-55 | T.J. Lomax, D.L. Schrank, S.M. Turner, T. Geng, Y. Li, N. Koncz | February 2011 |
| Planning Tools to Assess the Real Estate Leveraging Potential for Roadways and Transit: Technical Report | 0-6538-1 | S.R. Vadali, R. Aldrete, A. Bujanda, S. Samant, Y. Li, T.S. Geiselbrecht, B.T. Kuhn, S. Lyle, K. Dalton, M. Zhang, S. Tooley | January 2011 |
| Super 2 Design for Higher Traffic Volumes | 0-6135-S | M.A. Brewer, S.P. Venglar, L. Ding, K. Fitzpatrick, B. Park | 2011 |
| Workshop Materials for Preserving and Enhancing the Functionality of Highways in Texas | 0-6208-P2 | E.N. Hard, B.S. Bochner, Y. Li | September 2010 |
| Estimated Impacts of the 2010 Census on the Texas Transit Funding Formula | 0-6199-1 | K. Eschbach, M. Cline, L.K. Cherrington, A.S. Edrington, P.L. Ellis, E. Kraus | September 2010 |
| Strategies and Recommendations for Integrating Utility and Environmental Processes at TxDOT | 0-6065-P1 | C.A. Quiroga | May 2010 |
| Swim Lane Diagrams | 0-6065-P2 | C.A. Quiroga | May 2010 |
| Guidebook on Preserving the Functionality of State Highways in Texas | 0-6208-P1 | E.N. Hard, B.S. Bochner, Y. Li | May 2010 |
| Improving Mobility Information with Better Data and Estimation Procedures | UTCM 09-17-09 | T.J. Lomax, B. Wang, D.L. Schrank, W.L. Eisele, S.M. Turner, D.R. Ellis, Y. Li, N.A. Koncz, T. Geng | March 2010 |
| Integrating Utility Conflict Elimination and Environmental Processes | 0-6065-S | C.A. Quiroga, E. Kraus, J.H. Overman, N.A. Koncz | February 2010 |
| Preserving the Functionality/Asset Value of the State Highway System: Technical Report | 0-6208-1 | E.N. Hard, B.S. Bochner, Y. Li, Y. Qi, I. Damnjanovic, W.E. Frawley | February 2010 |
| Integration of Utility and Environmental Activities in the Project Development Process | 0-6065-1 | C.A. Quiroga, E. Kraus, J.H. Overman, N.A. Koncz | January 2010 |
| Utility Installation Review System - 2008 Follow-up Report | 5-2110-03-4 | C.A. Quiroga, J.T. Le, Y. Li | November 2009 |
| Capacity and Road User Cost Analysis of Selected Freeway Work Zones in Texas | 0-5619-1 | D.W. Borchardt, G. Pesti, D. Sun, L. Ding | September 2009 |
| Frontage Road Yield Treatment Analysis Tool (FRYTAT) Database: User Guide | 0-4986-P2 | K.O. Obeng-Boampong, L. Ding, R.H. Henk, M.Y. Garcia | August 2009 |
| Analysis and Integration of Spatial Data for Transportation Planning | 0-5696-1 | C.A. Quiroga, Y. Li, N.A. Koncz, J.H. Overman | June 2009 |
| Utility Accommodation and Conflict Tracker (UACT) Installation and Configuration Manual | 0-5475-2 | E. Kraus, J.T. Le, H. Dawood | April 2009 |
| Utility Accommodation and Conflict Tracker (UACT): User Manual | 0-5475-3 | E. Kraus, H. Dawood | April 2009 |
| Development of a Utility Conflict Management System | 0-5475-4 | E. Kraus, C.A. Quiroga, N.A. Koncz, H. Dawood | April 2009 |
| Prototype Utility Conflict Data Management System, Beta Version | 0-5475-P2 | E. Kraus | April 2009 |
| Utility Installation Review System - Implementation Report | 5-2110-03-2 | C.A. Quiroga, Y. Li, J.T. Le, E. Kraus | March 2009 |
| Development of Frontage Road Yield Treatment Analysis Tool (FRYTAT) Database Software | 0-4986-2 | K.O. Obeng-Boampong, L. Ding, R.H. Henk, M.Y. Garcia | March 2009 |
| Updated Work Zone Capacities | 0-5619-S | D.W. Borchardt, G. Pesti, D. Sun, L. Ding | February 2009 |
| Establishing Advisory Speeds on Non Direct-Connect Ramps: Technical Report | 0-6035-1 | S.P. Venglar, R.J. Porter, K.O. Obeng-Boampong, s. Kuchangi | February 2009 |
| Right of Way Real Property Asset Management - Prototype Data Architecture | 0-5788-1 | C.A. Quiroga, E. Kraus, N.A. Koncz, S. Lyle, Y. Li | 2009 |
| An Assessment of Yield Treatments at Frontage Road-Exit Ramp and Frontage Road-U-Turn Merge Areas | 0-4986-1 | K.O. Obeng-Boampong, L. Ding, R.H. Henk, J.C. Williams, P. Vo | November 2008 |
| Utility Installation Review (UIR) System Training Materials | 5-2110-03-P2 | C.A. Quiroga, Y. Li, J.T. Le | October 2008 |
| Hurricane Evacuation Traffic Operations | 0-4962-1 | A.J. Ballard, B.R. Ullman, N.D. Trout, S.P. Venglar, D.W. Borchardt, A.P. Voigt, K.O. Obeng-Boampong, R. Rajbhandari | March 2008 |
| Engineering Design Data Management - Practices and Framework Development | 0-5246-1 | C.A. Quiroga, N.A. Koncz | February 2008 |
| Inventory of Utilities-Summary Report | 5-2110-01-4 | C.A. Quiroga, K. Hamad, E. Kraus | January 2008 |
| Managed Lane Strategies Feasible for Freeway Ramp Applications | 0-5284-2 | B.T. Kuhn, K.N. Balke, N.A. Chaudhary, D.L. Jasek, G.J. Karkee, K.O. Obeng-Boampong, J.A. Shelton, S.P. Venglar | January 2008 |
| Collection, Integration and Analysis of Utility Data in the Transportation Project Development Process | 0-5475-S | E. Kraus, C.A. Quiroga, N.A. Koncz, J.T. Le | 2008 |
| Guidelines for Applying Managed Lane Strategies to Ramps | 0-5284-P1 | B.T. Kuhn, K.N. Balke, N.A. Chaudhary, D.L. Jasek, G.J. Karkee, K.O. Obeng-Boampong, J.A. Shelton, S.P. Venglar | December 2007 |
| Data Model and Guidelines for Managing Engineering Design Data in a GIS Environment | 0-5246-S | C.A. Quiroga, N.A. Koncz, E. Kraus, J.T. Le, K. Hamad, R. Rajbhandari | December 2007 |
| Specification Framework for Communication Utilities and Estimation of Utility Adjustment Costs | 0-4998-3 | C.A. Quiroga, D. Ford, T.R. Taylor, S. Kranc, E. Kraus, E. Park | December 2007 |
| Feasibility and Guidelines for Applying Managed Lane Strategies to Ramps | 0-5284-S | B.T. Kuhn, K.N. Balke, N.A. Chaudhary, D.L. Jasek, G.J. Karkee, K.O. Obeng-Boampong, J.A. Shelton, S.P. Venglar, R. Cheu | November 2007 |
| Applying Techniques to Increase Warning of Signals Beyond Vertical Curves | 5-4084-01-1 | S.P. Venglar, K.O. Obeng-Boampong | October 2007 |
| Ramp Reversal Projects: Guidelines for Successful Implementation | 0-5105-1 | S.A. Cooner, S.P. Venglar, Y.K. Rathod, E.J. Pultorak, J.C. Williams, P. Vo, S. Mattingly | July 2007 |
| A Unit Cost and Construction Specification Framework for Utility Installations | 0-4998-1 | C.A. Quiroga, S. Kranc, D. Ford, E. Kraus, T.R. Taylor | March 2007 |
| Construction Specification Requirements for Water and Sanitary Sewer Installations | 0-4998-2 | C.A. Quiroga, S. Kranc, D. Ford, E. Kraus, T.R. Taylor | March 2007 |
| Transportation Operations Data Needs and Recommendations for Implementation | 0-5257-1 | C.A. Quiroga, K. Hamad, R.E. Brydia, R. Rajbhandari, R.J. Benz, S.R. Sunkari | March 2007 |
| Development of a Utility Conflict Management Tool | 0-5475-1 | E. Kraus, C.A. Quiroga, R.M. Brown, C.R. Stevens, N.A. Koncz | January 2007 |
| Development of Guidelines for Ramp Reversal Projects | 0-5105-S | S.A. Cooner, S.P. Venglar, E.J. Pultorak, Y.K. Rathod, J.C. Williams, P. Vo, S. Mattingly | December 2006 |
| Strategies for Managing Transportation Operations Data | 0-5257-S | C.A. Quiroga, K. Hamad, R.E. Brydia, R. Rajbhandari, S.R. Sunkari, S.M. Turner, R.J. Benz | November 2006 |
| Strategies for Separating Trucks from Passenger Vehicles: Truck Facility Guidebook | 0-4663-P1 | D.R. Middleton, S.P. Venglar, C.A. Quiroga, D. Lord | October 2006 |
| Strategies for Separating Trucks from Passenger Vehicles: Final Report | 0-4663-2 | D.R. Middleton, S.P. Venglar, C.A. Quiroga, D. Lord, D.L. Jasek | 2006 |
| Improving Safety and Operations of Traffic Signals Near Railroad Grade Crossings with Active Warning Devices | 0-4265-S | K.N. Balke, R.J. Engelbrecht, S.R. Sunkari, S.P. Venglar | December 2005 |
| Using Archived ITS Data to Optimize Incident Detection and Management | 0-4745-S | C.A. Quiroga, K. Hamad, E. Kraus, E. Park, R.J. Pina | December 2005 |
| Incident Evaluation Procedures and Implementation Requirements | 0-4745-2 | C.A. Quiroga, K. Hamad, E. Park | October 2005 |
| Incident Detection Optimization and Data Quality Control | 0-4745-3 | C.A. Quiroga, K. Hamad, E. Park | October 2005 |
| Findings from Texas: Five Years of Research on Managed Lanes | 0-4160-25 | B.T. Kuhn, V.D. Goodin, A.J. Ballard, M.A. Brewer, R.E. Brydia, J.L. Carson, S.T. Chrysler, T.S. Collier, W.L. Eisele, D.W. Fenno, K. Fitzpatrick, G.L. Ullman, S.P. Venglar | September 2005 |
| Engineering Solutions to Improving Operations and Safety at Signalized Intersections near Railroad Grade Crossings with Active Devices | 0-4265-1 | R.J. Engelbrecht, K.N. Balke, S.R. Sunkari, S.P. Venglar | September 2005 |
| Strategies for Separating Trucks from Passenger Vehicle Traffic | 0-4663-S | D.R. Middleton, S.P. Venglar, C.A. Quiroga, D. Lord | August 2005 |
| Work Zone Crash Influences on Texas Roadways | 0-4028-S | G.L. Ullman, S.D. Schrock, A.S. Cothron, E. Kraus, A.P. Voigt | May 2005 |
| An Analysis of Fatal Work Zone Crashes in Texas | 0-4028-1 | S.D. Schrock, G.L. Ullman, A.S. Cothron, E. Kraus, A.P. Voigt | October 2004 |
| Incident Characteristics and Impact on Freeway Traffic | 0-4745-1 | C.A. Quiroga, E. Kraus, R.J. Pina, K. Hamad, E. Park | October 2004 |
| Utility Installation Review System - Progress Report | 5-2110-03-1 | C.A. Quiroga, R.J. Pina, D.R. Dennis, S. Sunkari | October 2004 |
| Year 4 Annual Report of Progress: Operating Freeways with Managed Lanes | 0-4160-19 | B.T. Kuhn, V.D. Goodin, A.J. Ballard, R.E. Brydia, S.T. Chrysler, T.S. Collier, A.S. Cothron, W.L. Eisele, D.W. Fenno, K.M. Fitzpatrick, S.Y. Song, G.L. Ullman, S.P. Venglar | September 2004 |
| Signal Optimization and Analysis Using Passer V - Training Workshop | 5-4020-01-P1 | N.A. Chaudhary, S.P. Venglar, C. Chu | September 2004 |
| Methodology for Determination of Optimal Traffic Responsive Plan Selection Control Parameters | 0-4421-1 | M.M. Abbas, N.A. Chaudhary, A. Sharma, S.P. Venglar, R.J. Engelbrecht | February 2004 |
| Interim Manual for Managed Lanes | 0-4160-14 | B.T. Kuhn, V.D. Goodin, M.A. Brewer, T.S. Collier, K. Fitzpatrick, D.L. Jasek, S.P. Venglar | October 2003 |
| Truck Accommodation Design Guidance: Final Report | 0-4364-1 | D.R. Middleton, A. Clayton, C.A. Quiroga, D.L. Jasek | October 2003 |
| GIS-Based Assessment of Highway Network, Crash, and Traffic Volume Data in the Laredo-Nuevo Laredo Area | SWUTC/03/167426-1 | C.A. Quiroga, R.J. Pina, M.A. Perez | October 2003 |
| Utilities in the Right-of-Way: Inventory and Data Management | 0-2110-S | C.A. Quiroga, C.D. Ellis, S. Shin, R.J. Pina | September 2003 |
| Year 3 Annual Report of Progress: Operating Freeways with Managed Lanes | 0-4160-15 | B.T. Kuhn, V.D. Goodin, S.T. Chrysler, T.S. Collier, A.S. Cothron, W.L. Eisele, D.W. Fenno, K. Fitzpatrick, G.L. Ullman, S.P. Venglar | September 2003 |
| Review and Evaluation of Enforcement Issues and Safety Statistics Related to Red-Light-Running | 0-4196-1 | J.A. Bonneson, K.H. Zimmerman, C.A. Quiroga | September 2003 |
| Red Light Running - A Policy Review | TTI-2003-6 | C.A. Quiroga, E. Kraus, I. van Schalkwyk, J.A. Bonneson | March 2003 |
| Managed Lane Ramp and Roadway Design Issues | 0-4160-10 | K.M. Fitzpatrick, M.A. Brewer, S.P. Venglar | January 2003 |
| Managed Lanes - Traffic Modeling | 0-4160-4 | S.P. Venglar, D.W. Fenno, S. Goel, P.A. Schrader | October 2002 |
| Year 2 Annual Report of Progress: Operating Freeways with Managed Lanes | 0-4160-12 | B.T. Kuhn, V.D. Goodin, T.S. Collier, A.S. Cothron, W.L. Eisele, K. Fitzpatrick, S.P. Venglar | September 2002 |
| Summary Report on Improving Diamond Interchange Operations Using Advanced Controller Features | 4158-S | R.J. Engelbrecht, S.P. Venglar, Z. Tian | April 2002 |
| The Preempt Trap: How to Make Sure you do Not Have One | 0-1752-9 | R.J. Engelbrecht, S.R. Sunkari, T. Urbanik, S.P. Venglar, K.N. Balke | March 2002 |
| A Data Platform for Managing Utilities Along Highway Corridors | 0-2110-1 | C.A. Quiroga, C.D. Ellis, S. Shin, R.J. Pina | February 2002 |
| A Data Platform for Managing Utilities Along Highway Corridors: User Manual | 0-2110-2 | C.A. Quiroga, C.D. Ellis, S. Shin, R.J. Pina | February 2002 |
| Research Report on Improving Diamond Interchange Operations Using Advanced Controller Features | 4158-1 | R.J. Engelbrecht, S.P. Venglar, Z. Tian | October 2001 |
| Guide for Traffic Signal Preemption Near Railroad Grade Crossing | 1439-9 | S.P. Venglar, M.S. Jacobson, S.R. Sunkari, R.J. Engelbrecht, T. Urbanik | September 2000 |
| Feasibility of Portable Traffic Signals to Replace Flaggers in Maintenance Operations | 7-3926-S | V.D. Goodin, S.P. Venglar, D.L. Picha | March 2000 |
| Feasibility of Portable Traffic Signals to Replace Flaggers in Maintenance Operations | 7-3926-1 | V.D. Goodin, S.P. Venglar, D.L. Picha | February 2000 |
| Guidelines for the Use of Portable Traffic Signals in Rural Two-Lane Maintenance Operations | 7-3926-2 | V.D. Goodin, S.P. Venglar, D.L. Picha | February 2000 |
| Summary of Highway/Rail Intersection Research at the Texas A&M University ITS Research Center of Excellence | RCE-99/02 | J.W. Webb, R.E. Bartoskewitz, H.A. Richards, S.P. Venglar, D. Bullock, T. Urbanik | April 1999 |
| A GPS Based Approach for the Analysis of Car Following Behavior | TRB 990112 | Y. Hatipkarasulu, B. Wolshon, C.A. Quiroga | 1999 |
| Travel Time Information Using GPS and Dynamic Segmentation Techniques | TRB 990165 | C.A. Quiroga, D. Bullock | 1999 |
| Evaluation of Innovative Coordination Methods Utilizing ITS Technology for Traffic Signals | 7-2971-S | S.P. Venglar | October 1997 |
| Before-and-After Analysis of Advanced Transportation Management Systems | 1467-3 | R.H. Henk, M.E. Molina, S.P. Venglar | September 1997 |
| Real-Time Assessment and Use of Arterial Street Capacity for Freeway Diversion Routing | 2978-1F | K.S. Rao, S.P. Venglar, R. Sarma, V. Bogarapu | October 1996 |
| Real-Time, Multimodal Traffic-Adaptive Diamond Interchange Control System: Laboratory Demonstration | TTI/ITS RCE-95/01 | S.P. Venglar, T. Urbanik | June 1995 |
| Development of Analytical Tools for Evaluating Operations of Light Rail at Grade Within an Urban Signal System - Final Report | 1278-4F | S.P. Venglar, D.B. Fambro, C.H. Walters | November 1994 |
| Development of Analytical Tools for Evaluating Operations of Light Rail at Grade Within an Urban Signal System - Interim Report 2 | 1278-2 | S.P. Venglar, D.B. Fambro, C.H. Walters | July 1994 |
| Development of Analytical Tools for Evaluating Operations of Light Rail at Grade within an Urban Signal System - Interim Report | 1278-1 | C.H. Walters, S.P. Venglar, D.B. Fambro, J.R. Daniel | July 1993 |
