| Title/Report Number |
Author(s) |
Date |
Price |
| A Guidebook for Effective Use of Archived Operations Data at Transportation Management Centers 0-5485-P1 |
P. Songchitruksa, K.N. Balke, Y. Zhang, K. Hamad, G. Pesti |
January 2008 |
$0.00 |
| A Guidebook for Effective Use of Incident Data at Texas Transportation Management Centers 0-5485-P2 |
P. Songchitruksa, K.N. Balke, X. Zeng, C. Chu, Y. Zhang |
February 2009 |
$0.00 |
| A Model for Evaluating Integration Strategies for Operating Diamond Interchange and Ramp Metering 0-1752-14 |
Z. Tian, K.N. Balke |
September 2003 |
$0.00 |
| Advance Warning for End-of-Green Phase to Reduce Red-Light-Running 0-4260-S |
C.J. Messer, S.R. Sunkari, H.A. Charara, R.T. Parker |
September 2004 |
$0.00 |
| Advanced Notification Messages and Use of Sequential Portable Changeable Message Signs in Work Zones 0-4748-1 |
G.L. Ullman, B.R. Ullman, C.L. Dudek, A.A. Williams, G. Pesti |
October 2005 |
$0.00 |
| Advanced Technologies for Communicating with Motorists: a Synthesis of Human Factors and Traffic Management Issues 1232-8 |
K.N. Balke, G.L. Ullman |
May 1992 |
$0.00 |
| Advanced Transportation Management System (ATMS) Evaluation -- User Interface 0-1752-10 |
H.A. Charara, R.E. Brydia, K.N. Balke |
October 2003 |
$0.00 |
| Alternative Vehicle Detection Technologies for Traffic Signal Systems: Technical Report 0-5845-1 |
D.R. Middleton, H.A. Charara, R.R. Longmire |
February 2009 |
$0.00 |
| Alternative Vehicle Detection Technologies for Traffic Signals 0-5845-S |
D.R. Middleton, R.R. Longmire, H.A. Charara |
February 2009 |
$0.00 |
| Alternatives Weigh-in-Motion Plan for Statewide Data 0-5551-S |
E.G. Fernando, D.R. Middleton, T.B. Carlson, L. Ruback, E.D. Sepulveda, R.R. Longmire, T.J. Freeman, J.H. Oh |
August 2008 |
$0.00 |
| An Assessment of a Major Traffic Monitoring System for a Major Traffic Generator to Improve Regional Planning: Project Summary Report 0-5531-S |
T.B. Carlson, E.D. Sepulveda, J.A. Crawford, L. Ruback, D.R. Middleton, J. Weissmann |
2008 |
$0.00 |
| An Evaluation of Existing Incident Detection Algorithms 1232-20 |
K.N. Balke |
November 1993 |
$0.00 |
| An Intelligent Control System for Detecting and Progressing Platoons at Isolated Traffic Signals 0-4304-S |
N.A. Chaudhary, M.M. Abbas, H.A. Charara, R.T. Parker |
March 2005 |
$0.00 |
| An Investigation into the Evaluation and Optimization of the Automatic Incident Detection Algorithm Used in TxDOT Traffic Management Systems 0-4770-1 |
R.E. Brydia, J.D. Johnson, K.N. Balke |
October 2005 |
$0.00 |
| Automated Turning Movement Counts from Shared Lane Configurations at Signalized Diamond Interchanges TRB 001551 |
S.R. Sunkari, H.A. Charara, T. Urbanik |
2000 |
$0.00 |
| Background Development and Concept of Operations for a Real-Time Performance Measurment Monitoring System SWUTC/06/167147-1 |
R.E. Brydia |
April 2006 |
$0.00 |
| Benefits of Real-Time Travel Information in Houston, Texas SWUTC/95/60010-1 |
K.N. Balke, G.L. Ullman, W.R. McCasland, C.E. Mountain, C.L. Dudek |
January 1995 |
$0.00 |
| Benefits of the Texas Traffic Light Synchronization (TLS) Grant Program I: Volume I, Executive Summary and Appendices A-D 0258-1 |
D.B. Fambro, C.A. Lopez, S.R. Sunkari |
1992 |
$0.00 |
| Benefits of the Texas Traffic Light Synchronization (TLS) Grant Program I: Volume II, Appendix E 0258-2 |
D.B. Fambro, C.A. Lopez, S.R. Sunkari |
1992 |
$0.00 |
| Benefits of the Texas Traffic Light Synchronization (TLS) Grant Program I: Volume III, Appendices F-G 0258-3 |
D.B. Fambro, C.A. Lopez, S.R. Sunkari |
1992 |
$0.00 |
| Benefits of the Texas Traffic Light Synchronization (TLS) Grant Program II: Volume I. Executive Summary and Appendices A-C 3010-1F, Vol. I |
D.B. Fambro, S.M. Sangineni, C.A. Lopez, S.R. Sunkari, R.T. Barnes |
1995 |
$0.00 |
| Benefits of the Texas Traffic Light Synchronization (TLS) Grant Program II: Volume II. Appendices D-F 3010-1F, Vol. II |
D.B. Fambro, S.M. Sangineni, C.A. Lopez, S.R. Sunkari, R.T. Barnes |
1995 |
$0.00 |
| Benefits of the Texas Traffic Management (TM) Grant Program: Volume I, Executive Summary and Appendices A - B TxDOT/TTI 8820-1 |
D.B. Fambro, S.R. Sunkari, C.A. Lopez, S.M. Sangineni, R.T. Barnes |
1993 |
$0.00 |
| Benefits of the Texas Traffic Management (TM) Grant Program: Volume II, Appendices C - D TxDOT/TTI 8820-2 |
S.R. Sunkari, D.B. Fambro, C.A. Lopez, S.M. Sangineni, R.T. Barnes |
1993 |
$0.00 |
| Capacity and Road User Cost Analysis of Selected Freeway Work Zones in Texas 0-5619-1 |
D.W. Borchardt, G. Pesti, D. Sun, L. Ding |
September 2009 |
$0.00 |
| Center-to-Center Communications in Low-Bandwidth Environments 0-1752-11 |
R.E. Brydia, S.J. Liu, K.N. Balke |
October 2003 |
$0.00 |
| Communications Trends and their Impact on TxDOT ITS Deployments 0-5586-1 |
R.E. Brydia, L. Ruback, R. Rajbhandari, J.D. Johnson, B.E. Brackin |
February 2008 |
$0.00 |
| Comprehensive Guide to the Use of IP-Based Video for Traffic Operations 0-5942-S |
R.E. Brydia, B.E. Brackin, R.F. De Roche, J.D. Johnson, G.B. Thomas |
May 2009 |
$0.00 |
| Concepts for Managing Freeway Operations During Weather Events 0-5278-1 |
K.N. Balke, P. Songchitruksa, H. Liu, R.E. Brydia, D.L. Jasek, R.J. Benz |
February 2007 |
$0.00 |
| Coordination of Diamond Interchanges with Adjacent Traffic Signals 7-4913-1 |
N.A. Chaudhary, C. Chu, K.N. Balke, V.G. Kovvali |
October 2000 |
$0.00 |
| Cost-Effective Technologies for Advance Detection 0-5002-S |
S.R. Sunkari, R.T. Parker, H.A. Charara, T.A. Palekar, D.R. Middleton |
January 2006 |
$0.00 |
| Credit-Based Value Pricing in Texas: An Examination of the Issues 0-4119-S |
M.W. Burris, K.N. Womack, T.S. Collier, S.R. Vadali, J.R. Winn, V.D. Goodin, M.D. Middleton |
January 2005 |
$0.00 |
| Data Access Requirements for Texas Traffic Management Centers 0-5213-S |
E.J. Seymour, J.D. Carvell, D.W. Borchardt, R.E. Brydia, C.M. Poe, M.D. Bomar |
November 2006 |
$0.00 |
| Demonstration of a Mobile Application of CVO Weight Enforcement Screening RCE-99/03 |
D.R. Middleton, L. Ruback |
|
$0.00 |
| Deploying Weigh-In-Motion Installations on Asphalt Concrete Pavements 0-5551-1 |
E.G. Fernando, D.R. Middleton, T.B. Carlson, R.R. Longmire, E.D. Sepulveda, L. Ruback, T.J. Freeman, J.H. Oh |
February 2009 |
$0.00 |
| Design Criteria for Ramp Metering: Appendix to TxDOT Roadway Design Manual 0-2121-3 |
N.A. Chaudhary, C.J. Messer |
November 2000 |
$0.00 |
| Design and Installation Guidelines for Advance Warning Systems for End-of-Green Phase at High Speed Traffic Signals 0-4260-2 |
C.J. Messer, S.R. Sunkari, H.A. Charara |
December 2003 |
$0.00 |
| Designing Freeway On-Ramps for Metering 0-2121-S |
N.A. Chaudhary, C.J. Messer |
January 2001 |
$0.00 |
| Designing Optimal and Robust Traffic Responsive Plan Selection Control 0-4421-S |
M.M. Abbas, N.A. Chaudhary, G. Pesti, A. Sharma |
June 2005 |
$0.00 |
| Developing Sustainable Transportation Performance Measures for TxDOT's Strategic Plan 0-5541-S |
J. Zietsman, T.L. Ramani, W.L. Eisele, R.E. Brydia, J.D. Johnson, D.L. Spillane, B.S. Bochner, D. Rosa |
January 2009 |
$0.00 |
| Development and Evaluation of a Detection-Control System for Rural Intersections 0-4022-1 |
J.A. Bonneson, D.R. Middleton, K.H. Zimmerman, H.A. Charara, M.M. Abbas |
September 2001 |
$0.00 |
| Development and Evaluation of a Framework for Selecting Operational Strategies for an Integrated Diamond Interchange - Ramp Metering Control System SWUTC/04/473700-00025-1 |
Z. Tian, K.N. Balke |
August 2004 |
$0.00 |
| Development and Evaluation of an Intelligent Bus Priority Concept TRB 001543 |
K.N. Balke, C.L. Dudek, T. Urbanik |
2000 |
$0.00 |
| Development of Advance Warning Systems for End-of-Green Phase at High Speed Traffic Signals 0-4260-4 |
C.J. Messer, S.R. Sunkari, R.T. Parker, H.A. Charara |
January 2004 |
$0.00 |
| Development of Criteria and Guidelines for Installing, Operating and Removing TxDOT Ramp Control Signals 0-5294-1 |
K.N. Balke, N.A. Chaudhary, P. Songchitruksa, G. Pesti |
May 2009 |
$0.00 |
| Development of Guidelines for Data Access for Texas Traffic Management Centers 0-5213-1 |
E.J. Seymour, J.D. Carvell, D.W. Borchardt, R.E. Brydia, C.M. Poe, M.D. Bomar |
May 2007 |
$0.00 |
| Development of TxDOT Procedures and Specifications for Testing Device Compliance to NTCIP Standards 0-5003-S |
R.F. De Roche, K.N. Balke, G.C. Herrick |
October 2006 |
$0.00 |
| Development of a Distributed Hardware-in-the-Loop Simulation System for Transportation TRB 990599 |
R.J. Engelbrecht, C.M. Poe, K.N. Balke |
1999 |
$0.00 |
| Development of a Prototype Dynamic Congestion and Incident Prediction System 0-4946-2 |
K.N. Balke, P. Songchitruksa, N.A. Chaudhary, C. Chu, S. Sunkari, P. Nelson, s. Kuchangi, V. Tyagi, D. Swaroop |
March 2007 |
$0.00 |
| Development of a Special Topics Course on Intelligent Transportation Systems for the Zachry Department of Civil Engineering of Texas A&M University UTCM 08-27-02 |
K.N. Balke, R.E. Brydia |
August 2009 |
$0.00 |
| Development of a Traffic Signal Performance Measurement System (TSPMS) 0-4422-2 |
K.N. Balke, H.A. Charara, R.T. Parker |
May 2005 |
$0.00 |
| Development of a Video over IP Guidebook 0-5942-1 |
R.E. Brydia, B.E. Brackin, R.F. De Roche, J.D. Johnson, G.B. Thomas |
September 2009 |
$0.00 |
| Development of a Wireline Communications Design Guidebook for Intelligent Transportation Systems 0-4969-1 |
R.E. Brydia, B.E. Brackin, J.D. Johnson, G.B. Thomas, K.N. Balke |
October 2005 |
$0.00 |
| Development of an ITS Data Management System TRB 981253 |
R.E. Brydia, S.M. Turner |
1998 |
$0.00 |
| Displaying Response Status Messages to Motorists During Incident Conditions 4907-4 |
B.R. Ullman, K.N. Balke |
October 2000 |
$0.00 |
| Distributed Architecture and Algorithm for Robust Real-Time Progression Evaluation and Improvement 0-4729-2 |
M.M. Abbas, H.A. Charara, N.A. Chaudhary, Y. Jung |
April 2006 |
$0.00 |
| Dynamic Traffic Flow Modeling for Incident Detection and Short-Term Congestion Prediction 0-4946-S |
K.N. Balke, N.A. Chaudhary, P. Songchitruksa, C. Chu, S. Sunkari, P. Nelson, S. Kunchangi, V. Tyagi, D. Swaroop |
October 2006 |
$0.00 |
| Dynamic Traffic Flow Modeling for Incident Detection and Short-Term Congestion Prediction: Year 1 Progress Report 0-4946-1 |
K.N. Balke, N.A. Chaudhary, C. Chu, S.P. Kuchangi, P. Nelson, P. Songchitruksa, D. Swaroop, V. Tyagi |
September 2005 |
$0.00 |
| Effect of Freeway Corridor Attributes Upon Motorist Diversion Responses to Real-Time Travel Time Information 1232-13 |
G.L. Ullman, C.L. Dudek, K.N. Balke |
October 1994 |
$0.00 |
| Engineering Solutions to Improving Operations and Safety at Signalized Intersections near Railroad Grade Crossings with Active Devices 0-4265-1 |
R.J. Engelbrecht, K.N. Balke, S.R. Sunkari, S.P. Venglar |
September 2005 |
$0.00 |
| Enhancements to PASSER V Signal Timing Optimization Program 0-5424-1 |
C. Chu, N.A. Chaudhary, J.D. Johnson, S.R. Sunkari |
February 2008 |
$0.00 |
| Enhancements to PIA System for Real-Time Control at Isolated Traffic Signals: Technical Report 0-5507-1 |
N.A. Chaudhary, H.A. Charara, S. Sunkari, R.R. Longmire |
April 2008 |
$0.00 |
| Enhancements to the Advance Warning of End of Green System (AWEGS) 0-5113-1 |
S.R. Sunkari, H.A. Charara, R.T. Parker, T.A. Palekar |
December 2006 |
$0.00 |
| Estimated Construction Period Impact of Widening U.S. 59 in Houston Texas 1288-S |
N.A. Chaudhary, K.N. Balke |
December 1997 |
$0.00 |
| Estimating the Benefits of Managed Lanes 08-05-04 |
M.W. Burris, S.N. Patil |
September 2009 |
$0.00 |
| Estimation of Travelers' Values of Time Using a Stated-Preference Survey with Variable Pricing Options SWUTC/06/167766-1 |
M.W. Burris, S.N. Patil |
December 2006 |
$0.00 |
| Ethernet for ITS Field Data Communications 0-4768-S |
L. Ruback, B.E. Brackin, D.W. Rickerson |
April 2005 |
$0.00 |
| Evaluating Criteria for Adapting HOV Lanes to HOT Lanes: Development and Application of HOT START Software Tool 0-4898-1 |
W.L. Eisele, H.T. Wilner, M. Bolin, W.R. Stockton, M.W. Burris, V.D. Goodin, T.S. Collier, J.R. Winn, L. Xu, M.L. Hoelscher |
April 2006 |
$0.00 |
| Evaluating and Improving Incident Management Using Historical Incident Data: Case Studies at Texas Transportation Management Centers. 0-5485-1 |
P. Songchitruksa, K.N. Balke, X. Zeng, C. Chu, Y. Zhang, G. Pesti |
August 2009 |
$0.00 |
| Evaluation and Modification of Sight Distance Criteria Used by TxDOT 0-1811-1 |
M.D. Wooldridge, A.H. Parham, K.M. Fitzpatrick, R.L. Nowlin, R.E. Brydia |
September 1998 |
$0.00 |
| Evaluation and Modification of Sight Distance Criteria Used by TxDOT 0-1811-S |
M.D. Wooldridge, A.H. Parham, R.L. Nowlin, K.M. Fitzpatrick, R.E. Brydia |
September 1998 |
$0.00 |
| Evaluation of Advance Coordination Features in Traffic Signal Controllers 0-4657-1 |
S.R. Sunkari, R.J. Engelbrecht, K.N. Balke |
September 2004 |
$0.00 |
| Evaluation of Arlington, Texas Diamond Interchange Strategy 970-1F |
C.J. Messer, N.A. Chaudhary |
August 1989 |
$0.00 |
| Evaluation of Cost-Effective Technologies for Advance Detection 0-5002-1 |
S.R. Sunkari, R.T. Parker, H.A. Charara, T.A. Palekar, D.R. Middleton |
September 2005 |
$0.00 |
| Evaluation of External Station Survey Methodologies for High Volume Locations 0-4869-1 |
E.N. Hard, S.P. Farnsworth, D.F. Pearson, P. Songchitruksa, D.L. Spillane, T.L. Forrest |
May 2006 |
$0.00 |
| Evaluation of Flush Medians and Two-Way, Left-Turn Lanes on Four-Lane Rural Highways 1293-1 |
K.N. Balke, K.M. Fitzpatrick |
November 1993 |
$0.00 |
| Evaluation of Innovative Methods to Reduce Stops to Trucks at Isolated Signalized Intersections 7-2972-S |
D.R. Middleton, D.L. Jasek, H.A. Charara, D. Morris |
September 1997 |
$0.00 |
| Evaluation of Traffic Control Devices: Fourth-Year Activities 0-4701-4 |
H.G. Hawkins, Jr., C.L. Williams, S.R. Sunkari |
May 2008 |
$0.00 |
| Examining the Feasibility of Credit-Based Value Pricing in Texas 0-4119-1 |
M.W. Burris, K.N. Womack, T.S. Collier, S.R. Vadali, J.R. Winn, M.D. Middleton, V.D. Goodin |
October 2003 |
$0.00 |
| Factors Affecting Traffic Operations on Seven-Lane Cross Sections 1293-2F |
K.N. Balke, K.M. Fitzpatrick, T.K. Lienau |
November 1993 |
$0.00 |
| Feasibility and Guidelines for Applying Managed Lane Strategies to Ramps 0-5284-S |
B.T. Kuhn, K.N. Balke, N.A. Chaudhary, D.L. Jasek, G.J. Karkee, K.O. Obeng-Boampong, J.A. Shelton, S.P. Venglar, R. Cheu |
November 2007 |
$0.00 |
| Feasibility of Ethernet as a Center to Field Network for ITS Field Data Communications 0-4768-1 |
L. Ruback, B.E. Brackin, D.W. Rickerson |
October 2004 |
$0.00 |
| Field Manual for Configuring Traffic-Responsive Control on TxDOT Closed-Loop Systems 5-4421-01-P1 |
G. Pesti, N.A. Chaudhary, M.M. Abbas |
August 2007 |
$0.00 |
| Field Manual for the Operation of Advance Warning of End of Green System (AWEGS) 5-5113-01-P1 |
S.R. Sunkari, H.A. Charara, J.D. Johnson |
October 2009 |
$0.00 |
| Findings from Texas: Five Years of Research on Managed Lanes 0-4160-25 |
B.T. Kuhn, V.D. Goodin, A.J. Ballard, M.A. Brewer, R.E. Brydia, J.L. Carson, S.T. Chrysler, T.S. Collier, W.L. Eisele, D.W. Fenno, K. Fitzpatrick, G.L. Ullman, S.P. Venglar |
September 2005 |
$0.00 |
| Foundation for Self-Tuning Closed-Loop Progression System 0-4729-1 |
M.M. Abbas, N.A. Chaudhary, H.A. Charara, Y. Jung |
September 2004 |
$0.00 |
| Guide for Traffic Signal Preemption Near Railroad Grade Crossing 1439-9 |
S.P. Venglar, M.S. Jacobson, S.R. Sunkari, R.J. Engelbrecht, T. Urbanik |
September 2000 |
$0.00 |
| Guidelines for Applying Managed Lane Strategies to Ramps 0-5284-P1 |
B.T. Kuhn, K.N. Balke, N.A. Chaudhary, D.L. Jasek, G.J. Karkee, K.O. Obeng-Boampong, J.A. Shelton, S.P. Venglar |
December 2007 |
$0.00 |
| Guidelines for Determination of Optimal Traffic Responsive Plan Selection Control Parameters 0-4421-2 |
M.M. Abbas, N.A. Chaudhary, G. Pesti, A. Sharma |
March 2005 |
$0.00 |
| Guidelines for Implementing Traffic Responsive Mode in TxDOT Closed-Loop Traffic Signal Systems 2929-3F |
K.N. Balke, R.S. Keithireddipalli, C.L. Brehmer |
August 1997 |
$0.00 |
| Guidelines for Installing an Intelligent Control System to Detect and Progress Platoons at Isolated Traffic Signals 0-4304-1 |
N.A. Chaudhary, M.M. Abbas, H.A. Charara, R.T. Parker |
August 2003 |
$0.00 |
| Guidelines for Ramp Terminal Spacing for Freeways 0-5860-S |
K. Fitzpatrick, R.J. Porter, G. Pesti, C. Chu, E. Park, T.Q. Le |
2009 |
$0.00 |
| Guidelines for Selecting Signal Timing Software 0-4020-P2 |
N.A. Chaudhary, V.G. Kovvali, S.M. Alam |
September 2002 |
$0.00 |
| Guidelines for Timing and Coordinating Diamond Interchanges with Adjacent Traffic Signals 7-4913-2 |
N.A. Chaudhary, C. Chu |
November 2000 |
$0.00 |
| Guidelines for the Evaluation of Dynamic Message Sign Performance 0-4772-1 |
J.M. Mounce, G.L. Ullman, G. Pesti, V.J. Pezoldt |
March 2007 |
$0.00 |
| Highway Construction, Maintenance, and Service Equipment Warning Lights and Pavement Data Collection System Safety 7-3972-1 |
G.L. Ullman, J.E. Ragsdale, N.A. Chaudhary |
October 1998 |
$0.00 |
| How Do Carpools Fit Into Managed Lane Policies? 0-5286-P2 |
V.D. Goodin, M.W. Burris, C.M. Dusza, D.H. Ungemah |
June 2009 |
$0.00 |
| ITS Data Management System: Year One Activities 0-1752-2 |
S.M. Turner, R.E. Brydia, J.C. Liu, W.L. Eisele |
August 1997 |
$0.00 |
| Identification and Testing of Measures to Improve Work Zone Speed Limit Compliance 0-4707-1 |
M.A. Brewer, G. Pesti, W.H. Schneider |
October 2005 |
$0.00 |
| Impacts of Curbside Vending on Intersection Flow and Safety |
K.N. Balke, W.R. McCasland |
1993 |
$0.00 |
| Implementation Guidelines for Retiming Arterial Networks 1164-4 |
D.B. Fambro, S.R. Sunkari, S.M. Sangineni |
February 1993 |
$0.00 |
| Implementation Guidelines for Retiming Arterial Streets 1164-2 |
D.B. Fambro, S.R. Sunkari, M.D. Williams, Y.D. Irvine |
1993 |
$0.00 |
| Implementation Guidelines for Retiming Freeway Corridors 1164-5F |
D.B. Fambro, S.R. Sunkari, S.M. Sangineni |
1993 |
$0.00 |
| Implementation Guidelines for Retiming Isolated Intersections 1164-1 |
D.B. Fambro, S.R. Sunkari, S.M. Hubbard, Y.D. Irvine |
1992 |
$0.00 |
| Implementation of Advance Warning of End of Green System (AWEGS): Implementation Report 5-5113-01-1 |
S.R. Sunkari, H.A. Charara, J.D. Johnson |
August 2009 |
$0.00 |
| Implementation of Arlington Ramp Metering System 7-3982-S |
N.A. Chaudhary |
January 2001 |
$0.00 |
| Implementation of Traffic Responsive Control on TxDOT Closed-Loop Systems 5-4421-01-2 |
G. Pesti, N.A. Chaudhary, M.M. Abbas |
August 2007 |
$0.00 |
| Improved Techniques for Traffic Control for Freeways and Work Zones 0-5326-S |
G. Pesti, P.B. Wiles, P. Songchitruksa, S.A. Cooner, R. Cheu, J.A. Shelton |
August 2007 |
$0.00 |
| Improved Temporary Traffic Control Guidelines for Urban Freeway Interchanges 0-5238-S |
G.L. Ullman, M.D. Finley, A.M. Pike, K.K. Knapp, P. Songchitruksa, A.A. Williams |
August 2007 |
$0.00 |
| Improved Work Zone Portable Changeable Message Sign Usage 0-4748-S |
G.L. Ullman, C.L. Dudek, B.R. Ullman, A.A. Williams, G. Pesti |
December 2005 |
$0.00 |
| Improvements to Video Imaging Detection for Dilemma Zone Protection 0-5774-1 |
D.R. Middleton, E. Park, R.R. Longmire, H.A. Charara |
February 2009 |
$0.00 |
| Improving Intersection Safety and Operations Using Advance Warning of End of Green System (AWEGS) 0-5113-S |
S.R. Sunkari, H.A. Charara, R.T. Parker, T.A. Palekar |
January 2007 |
$0.00 |
| Improving Safety and Operations of Traffic Signals Near Railroad Grade Crossings with Active Warning Devices 0-4265-S |
K.N. Balke, R.J. Engelbrecht, S.R. Sunkari, S.P. Venglar |
December 2005 |
$0.00 |
| Improving TxDOT's Incident Detection Algorithm 0-4770-S |
R.E. Brydia, J.D. Johnson, K.N. Balke |
January 2006 |
$0.00 |
| Incident Response and Clearance in the State of Texas: Case Studies of Four Motorist Assistance Patrols 1232-15 |
S. Wohlschlaeger, K.N. Balke |
October 1992 |
$0.00 |
| Incorporating the Effects of Signal Transitions in the Selection of Timing Plans in Traffic Responsive Signal Systems SWUTC/98/465080-1 |
K.N. Balke, K.S. Rao, M. Husted |
May 1998 |
$0.00 |
| Installation CD for Installing PIA Software, Version 2.1 0-5507-P1 |
N.A. Chaudhary |
October 2007 |
$0.00 |
| Integrating Train Information for Advanced Transportation Management 0-1752-7 |
L. Ruback, K.N. Balke |
March 2001 |
$0.00 |
| Intelligent Detection-Control System for Rural Signalized Intersections 0-4022-2 |
J.A. Bonneson, D.R. Middleton, K.H. Zimmerman, H.A. Charara, M.M. Abbas |
August 2002 |
$0.00 |
| Interoperability Issues on Managed Lanes Facilities 0-4160-18 |
R.E. Brydia, S.Y. Song |
September 2004 |
$0.00 |
| Managed Lane Strategies Feasible for Freeway Ramp Applications 0-5284-2 |
B.T. Kuhn, K.N. Balke, N.A. Chaudhary, D.L. Jasek, G.J. Karkee, K.O. Obeng-Boampong, J.A. Shelton, S.P. Venglar |
January 2008 |
$0.00 |
| Managed Lanes Handbook 0-4160-24 |
B.T. Kuhn, V.D. Goodin, A.J. Ballard, M.A. Brewer, R.E. Brydia, J.L. Carson, S.T. Chrysler, T.S. Collier, K. Fitzpatrick, D.L. Jasek, C.M. Dusza, G.L. Ullman |
October 2005 |
$0.00 |
| Managing Freeway Operations During Weather Events 0-5278-S |
K.N. Balke, P. Songchitruksa, H. Lui, R.E. Brydia, D.L. Jasek, R.J. Benz |
November 2006 |
$0.00 |
| Measuring and Improving Incident Response 4907-S |
K.N. Balke, S.A. Cooner, B.R. Ullman, D.W. Fenno, R. Arredondo |
January 2001 |
$0.00 |
| Method for Assessing Alternative Strategies for Incident Detection 1232-12 |
K.N. Balke, G.L. Ullman |
February 1993 |
$0.00 |
| Methodology for Determination of Optimal Traffic Responsive Plan Selection Control Parameters 0-4421-1 |
M.M. Abbas, N.A. Chaudhary, A. Sharma, S.P. Venglar, R.J. Engelbrecht |
February 2004 |
$0.00 |
| Methods and Guidelines for Evaluating Dynamic Message Sign Performance 0-4772-S |
J.M. Mounce, G.L. Ullman, G. Pesti, V.J. Pezoldt |
December 2006 |
$0.00 |
| Microscopic Datasets: A Novel Approach Applied to Visualization of Spatiotemporal Flow Regions SWUTC/06/167452-1 |
P. Nelson, M.J. Fields |
May 2006 |
$0.00 |
| New Detection System for Rural Signalized Intersections 0-4022-S |
J.A. Bonneson, D.R. Middleton, K.H. Zimmerman, H.A. Charara, M.M. Abbas |
March 2004 |
$0.00 |
| New PASSER Program for Timing Signalized Arterials 0-0-4020-S |
N.A. Chaudhary, C. Chu |
October 2003 |
$0.00 |
| Non-Vital Advance Rail Preemption of Signalized Intersections Near Highway-Rail Grade Crossings 0-4746-S |
L. Ruback, R.J. Engelbrecht, K.N. Balke |
August 2006 |
$0.00 |
| Non-Vital Advance Rail Preemption of Signalized Intersections near Highway-Rail Grade Crossings: Technical Report 0-4746-3 |
L. Ruback, K.N. Balke, R.J. Engelbrecht |
September 2007 |
$0.00 |
| Operating Guidelines for TxDOT Ramp Control Signals 0-5294-P1 |
K.N. Balke, P. Songchitruksa, N.A. Chaudhary, G. Pesti |
September 2009 |
$0.00 |
| Operations-Oriented Performance Measures for Freeway Management Systems: Final Report 0-5292-2 |
R.E. Brydia, S. Mattingly, M. Sattler, A. Upayokin |
December 2008 |
$0.00 |
| Operations-Oriented Performance Measures for Freeway Management Systems: Year 1 Report 0-5292-1 |
R.E. Brydia, W. Schneider, S. Mattingly, M. Sattler, A. Upayokin |
April 2007 |
$0.00 |
| Optimization of Left Turn Phase Sequence in Signalized Networks Using Maxband-86, Volume I: Summary Report |
C.J. Messer, G. Hogg, N.A. Chaudhary, E.C. Chang |
1986 |
$0.00 |
| PASSER III-90: Users Manual and Application Guide 1271-1F |
D.B. Fambro, N.A. Chaudhary, J.A. Bonneson, C.J. Messer, L.L. Arabie |
March 1991 |
$0.00 |
| PASSER IV-94, Version 1.0, User/Reference Manual 1271-1F |
N.A. Chaudhary, C.J. Messer |
December 1993 |
$0.00 |
| PASSER IV-96, Version 2.1, User/Reference Manual 1477-1 |
N.A. Chaudhary, C.J. Messer |
October 1996 |
$0.00 |
| PIA System Installation and User Guide 0-5507-P2 |
H.A. Charara, N.A. Chaudhary, S.R. Sunkari, R.R. Longmire |
February 2008 |
$0.00 |
| PILOT 05 - Pattern Identification Logic for Offset Tuning 0-4729-S |
M.M. Abbas, H.A. Charara, N.A. Chaudhary, Y. Jung |
February 2006 |
$0.00 |
| Pedestrian Timing Alternatives and Impacts on Coordinated Signal Systems Under Split Phasing Operations TRB |
Z. Tian, T. Urbanik, R. Englebrecht, K.N. Balke |
2001 |
$0.00 |
| Performance Measures for Analyzing Real-Time Freeway Operations 0-1752-12 |
R.E. Brydia, K.N. Balke |
October 2003 |
$0.00 |
| Platoon Identification and Accommodation System for Isolated Traffic Signals on Arterials 0-4304-2 |
N.A. Chaudhary, M.M. Abbas, H.A. Charara, R.T. Parker |
September 2003 |
$0.00 |
| Potential Measures of Assessing Signal Timing Performance Using Existing Technologies 0-4422-1 |
K.N. Balke, G.C. Herrick |
July 2004 |
$0.00 |
| Railroad Data Integration for Transportation Management Centers 0-2988-1 |
C.M. Poe, L. Ruback, R.E. Bartoskewitz, D. Halloin |
November 1996 |
$0.00 |
| Ramp Adaptive Metering Bottleneck Optimization (RAMBO) User's Manual 1232-31 |
C.J. Messer, M.E. Thomadakis, H.A. Charara, T. Urbanik |
November 1994 |
$0.00 |
| Ramp Metering Algorithms and Approaches for Texas 0-4629-1 |
N.A. Chaudhary, Z. Tian, C.J. Messer, C. Chu |
September 2004 |
$0.00 |
| Ramp Metering Technology and Practice: Tasks 1 and 2 Summary 0-2121-1 |
N.A. Chaudhary, C.J. Messer |
May 2000 |
$0.00 |
| Ramp-Metering Design and Operations Guidelines for Texas 0-2121-2 |
N.A. Chaudhary, C.J. Messer |
October 2000 |
$0.00 |
| Real-Time Application of Passer IV: Project Summary and Guidelines 1477-S |
N.A. Chaudhary |
October 1997 |
$0.00 |
| Real-Time Measures of Traffic Signal Performance 0-4422-S |
K.N. Balke, H.A. Charara, R.T. Parker |
May 2005 |
$0.00 |
| Recommendations for Highway Construction, Maintenance, and Service Equipment Warning Lights and Pavement Data Collection System Safety 7-3972-S |
G.L. Ullman, J.E. Ragsdale, N.A. Chaudhary |
October 1998 |
$0.00 |
| Recommendations for Ramp Metering Operations in Texas 0-4629-S |
N.A. Chaudhary |
May 2005 |
$0.00 |
| Reducing Truck Stops at High-Speed Isolated Traffic Signals 1439-8 |
S.R. Sunkari, H.A. Charara, T. Urbanik |
September 2000 |
$0.00 |
| Report on the Users Manual for the Microcomputer Version of PASSER III-88 478-1 |
D.B. Fambro, N.A. Chaudhary, C.J. Messer, R.U. Garza |
September 1988 |
$0.00 |
| Requirements Specification for DMS Message Optimization Software Tool (MOST) 0-4023-2 |
P.A. Davis, S. Sunkari, C.L. Dudek, K.N. Balke |
September 2002 |
$0.00 |
| Results of Simulation Studies Relating to the Operation of Closed-Loop Systems in a Traffic Responsive Mode 2929-2 |
K.N. Balke, R.S. Keithireddipalli, C.L. Brehmer |
January 1997 |
$0.00 |
| Role of Preferential Treatment of Carpools in Managed Lane Facilities 0-5286-S |
V.D. Goodin, M.W. Burris, C.M. Dusza, D.H. Ungemah |
August 2008 |
$0.00 |
| Signal Design Manual for Diamond Interchanges 1439-6 |
S.R. Sunkari, T. Urbanik |
September 2000 |
$0.00 |
| Signal Optimization and Analysis Using Passer V - Training Workshop 5-4020-01-P1 |
N.A. Chaudhary, S.P. Venglar, C. Chu |
September 2004 |
$0.00 |
| Signal Technician's Installation and Maintenance Manual for Advance Warning of End-of-Green Phase at High Speed Traffic Signals 0-4260-3 |
S.R. Sunkari, C.J. Messer, R.T. Parker, H.A. Charara |
December 2003 |
$0.00 |
| Site Selection and Preliminary Data Collection for Traffic Responsive Control on TxDOT Closed-Loop Systems 5-4421-01-1 |
M.M. Abbas, N.A. Chaudhary, G. Pesti |
October 2005 |
$0.00 |
| Software for Timing Signalized Arterials 0-4020-1 |
N.A. Chaudhary, V.G. Kovvali, C. Chu, S.M. Alam |
August 2002 |
$0.00 |
| Space Management: An Application of Dynamic Lane Assignment 1232-18 |
R.K. Jella, S.R. Sunkari, W.L. Gisler, N.J. Rowan, C.J. Messer |
February 1993 |
$0.00 |
| Strategies for Managing Transportation Operations Data 0-5257-S |
C.A. Quiroga, K. Hamad, R.E. Brydia, R. Rajbhandari, S.R. Sunkari, S.M. Turner, R.J. Benz |
November 2006 |
$0.00 |
| Studies to Improve Temporary Traffic Control at Urban Freeway Interchanges and Pavement Marking Material Selection in Work Zones 0-5238-2 |
G.L. Ullman, M.D. Finley, A.M. Pike, K.K. Knapp, P. Songchitruksa, A.A. Williams |
March 2008 |
$0.00 |
| Summary Report on Yellow and Red Intervals to Improve Signal Timing Plans for Left-Turn Movement 0-4273-S |
L. Yu, F. Qiao, Z. Tian, N.A. Chaudhary |
April 2005 |
$0.00 |
| Summary of High-Volume External Survey Methods for TxDOT 0-4869-S |
E.N. Hard, S.P. Farnsworth, D.F. Pearson, P. Songchitruksa, D.L. Spillane, T.L. Forrest |
August 2006 |
$0.00 |
| Summary of Treatments to Improve Work Zone Speed Limit Compliance 0-4707-S |
M.A. Brewer, G. Pesti, W.H. Schneider |
December 2005 |
$0.00 |
| TTI's Hardware-in-the-Loop Traffic Signal Controller Evaluation System 5-1752-01-1 |
K.N. Balke, R.J. Engelbrecht, S. Sunkari, H.A. Charara |
August 2005 |
$0.00 |
| Texas A&M ITS Research Center of Excellence Narrative Summary Report: Fiscal Year 1996-97 1439-4 |
T. Urbanik, K.F. Turnbull, E.W. Lindquist, D.R. Middleton, K.N. Balke, G.L. Ullman, G.C. Lobaugh |
October 1997 |
$0.00 |
| Texas A&M ITS Research Center of Excellence Narrative Summary Report: Fiscal Year 1997-98 1439-5 |
T. Urbanik, K.F. Turnbull, E.W. Lindquist, D.R. Middleton, K.N. Balke, T.J. Lomax, J.W. Webb, L.R. Rilett, S.R. Sunkari |
November 1998 |
$0.00 |
| Texas Reference Marker Automated RI-1 Diagrams 1909-1F |
S.O. Majdi, A. Kalamdani, H.A. Charara |
1993 |
$0.00 |
| The Preempt Trap: How to Make Sure you do Not Have One 0-1752-9 |
R.J. Engelbrecht, S.R. Sunkari, T. Urbanik, S.P. Venglar, K.N. Balke |
March 2002 |
$0.00 |
| The Role of Preferential Treatment for Carpools in Managed Lanes 0-5286-2 |
V.D. Goodin, M.W. Burris, C.M. Dusza, D. Ungemah, J. Li, S.A. Ardekani, S. Mattingly |
June 2009 |
$0.00 |
| Timing Diamond Interchanges and Closely Spaced Signals 7-4913-S |
N.A. Chaudhary, C. Chu |
December 2001 |
$0.00 |
| Traffic Control Strategies for Congested Freeways and Work Zones 0-5326-2 |
G. Pesti, P.B. Wiles, R. Cheu, P. Songchitruksa, J.A. Shelton, S.A. Cooner |
October 2008 |
$0.00 |
| Traffic Control for Short Duration and Stop-And-Go Maintenance Operations on Four-Lane Divided Roadways 377-2F |
C.L. Dudek, G.L. Ullman, K.N. Balke, R.A. Krammes |
March 1988 |
$0.00 |
| Traffic Signal Operations Handbook 0-5629-P1 |
J.A. Bonneson, S.R. Sunkari, M.P. Pratt |
March 2009 |
$0.00 |
| TransLink Information Database Requirements 0-2988-2F |
T.L. Stout, J.C. Liu, R.E. Brydia, C.M. Poe |
October 1996 |
$0.00 |
| TransLink: Innovations in Managing the Surface Transportation System 0-1752-S |
K.N. Balke, R.E. Brydia, R.J. Engelbrecht, Z. Tian, Sangita, L. Ruback, H.A. Charara, L.R. Rilett |
April 2005 |
$0.00 |
| Transportation Operations Data Needs and Recommendations for Implementation 0-5257-1 |
C.A. Quiroga, K. Hamad, R.E. Brydia, R. Rajbhandari, R.J. Benz, S.R. Sunkari |
March 2007 |
$0.00 |
| Updated Work Zone Capacities 0-5619-S |
D.W. Borchardt, G. Pesti, D. Sun, L. Ding |
February 2009 |
$0.00 |
| Use of Advance Coordination Features in TxDOT Traffic Signal Controllers 0-4657-S |
S.R. Sunkari, R.J. Engelbrecht, K.N. Balke |
January 2005 |
$0.00 |
| Use of Photogrammetry for Investigation of Traffic Incident Scenes 4907-2 |
S.A. Cooner, K.N. Balke |
October 2000 |
$0.00 |
| Using Operations-Oriented Performance Measures to Support Freeway Management Systems 0-5292-S |
R.E. Brydia, S. Mattingly, M. Sattler, A. Upayokin |
2008 |
$0.00 |
| Using Probe-Measured Travel Times to Detect Major Freeway Incidents in Houston, Texas TRB 960728 |
K.N. Balke, C.L. Dudek, C.E. Mountain |
1996 |
$0.00 |
| Utility Accommodation Options for Congestion in TxDOT Right-of-Way 0-4149-S |
B.T. Kuhn, R.E. Brydia, D.L. Jasek, A.H. Parham, B.R. Ullman, B.C. Blaschke |
September 2003 |
$0.00 |
| Utility Corridor Structures and Other Utility Accommodation Alternatives in TxDOT Right-of-Way 0-4149-1 |
B.T. Kuhn, D.L. Jasek, R.E. Brydia, A.H. Parham, B.R. Ullman, B.C. Blaschke |
September 2002 |
$0.00 |
| Vehicular Emissions and Fuel Consumption Estimation in PASSER IV SWUTC/95/465060-1 |
N.A. Chaudhary |
April 1995 |
$0.00 |
| Warrants for Installing and Operating Ramp Metering 0-5294-S |
K.N. Balke, N.A. Chaudhary, P. Songchitruksa, G. Pesti |
February 2009 |
$0.00 |
| Wireline Communications Workshop for Intelligent Transportation System Applications 0-4969-S |
R.E. Brydia, B.E. Brackin, J.D. Johnson, G.B. Thomas, K.N. Balke |
December 2005 |
$0.00 |
| Wireline Communications: A Design Guidebook for Intelligent Transportation Systems: Expanded Materials 5-4969-01-P1 |
R.E. Brydia, B.E. Brackin, J.D. Johnson, G.B. Thomas, K.N. Balke |
October 2007 |
$0.00 |
| Wireline ITS Communications Training: Year 1 Report of Activities 5-4969-01-1 |
R.E. Brydia |
November 2006 |
$0.00 |
| Wireline ITS Communications Training: Year 2 Report of Activities 5-4969-01-2 |
R.E. Brydia |
October 2007 |
$0.00 |
| Year 4 Annual Report of Progress: Operating Freeways with Managed Lanes 0-4160-19 |
B.T. Kuhn, V.D. Goodin, A.J. Ballard, R.E. Brydia, S.T. Chrysler, T.S. Collier, A.S. Cothron, W.L. Eisele, D.W. Fenno, K.M. Fitzpatrick, S.Y. Song, G.L. Ullman, S.P. Venglar |
September 2004 |
$0.00 |