Road User Cost Analysis: I-45 Gulf Freeway at Beltway 8 Interchange (CSJ 500-03-382) (TTI-1994-13)
Author(s):
D.W. Borchardt
Publication Date:
1994
Abstract:
Report Number:
TTI-1994-13
Keywords:
User Cost Analysis, Delay Saving Estimate, Construction Costs, Value of Time
Electronic Link(s):
Document/Product: http://tti.tamu.edu/documents/TTI-1994-13.pdf
Publication/Product Request
TTI reports and products are available for download at no charge. If an electronic version is not available and no instructions on how to obtain it are given, contact Publication Services at pubquest@ttimail.tamu.edu.

