Development of a Procedure for the Automated Collection of Flexible Pavement Layer Thickness and Materials: Phase IIA - Executive Summary Report (Prepared for Florida DOT State Project 99700-7550.) (99700-7550)
Author(s):
E.G. Fernando, K.R. Maser
Publication Date:
September 1993
Report Number:
99700-7550
Keywords:
Automated Collection, Flexible Pavement Layer Thickness, Ground Penetrating Radar, Inventory, Gpr
Electronic Link(s):
Document/Product: http://tti.tamu.edu/documents/99700-7550.pdf
Publication/Product Request
TTI reports and products are available for download at no charge. If an electronic version is not available and no instructions on how to obtain it are given, contact Publication Services at pubquest@ttimail.tamu.edu.

