Wireline ITS Communications Training: Year 2 Report of Activities (5-4969-01-2)

Full-Text PDF

Author(s):

R.E. Brydia

Publication Date:

October 2007

Abstract:

This report summarizes the Year 2 activities under Implementation Project 5-4969-01, "Wireline ITS Communications Training." The overall objectives of the project were to modify the workshop offerings developed in a previous project to an eight-hour format, and teach the workshop materials at 10 locations across the state, including a pilot workshop. Year 2 activities included teaching the workshops and preparing the final deliverable for the Texas Department of Transportation (TxDOT).

Report Number:

5-4969-01-2

Keywords:

ITS Communications, Workshop

Electronic Link(s):

Document/Product: http://tti.tamu.edu/documents/5-4969-01-2.pdf

Publication/Product Request

TTI reports and products are available for download at no charge. If an electronic version is not available and no instructions on how to obtain it are given, contact Publication Services at pubquest@ttimail.tamu.edu.