Implementation Report on PASSER V-07 Training Workshops (5-5424-01-1)

Full-Text PDF

Author(s):

N.A. Chaudhary, C. Chu

Publication Date:

March 2011

Abstract:

The objective of this project was to conduct one pilot workshop and five regular workshops to teach the effective use of the enhanced PASSER V-07 arterial signal timing optimization software. PASSER V-07 and materials for conducting a one-day training workshop were developed in Texas Department of Transportation research project 0-5424, Analytical Enhancements to PASSER V for Arterial and Access Management. This report describes the findings of this implementation project.

Report Number:

5-5424-01-1

Keywords:

PASSER V-07, Two-Way Stop-Controlled Intersections, Signalized Intersections, Signalized Diamond Interchanges, Signal Timing Optimization, Progression Bandwidth, Vehicular Delay

Electronic Link(s):

Document/Product: http://tti.tamu.edu/documents/5-5424-01-1.pdf

Publication/Product Request

TTI reports and products are available for download at no charge. If an electronic version is not available and no instructions on how to obtain it are given, contact Publication Services at pubquest@ttimail.tamu.edu.