TxDOT Administration Research: Tasks Completed FY2011 (0-6581-TI-3)

Full-Text PDF

Author(s):

S. Anderson, C.P. Beaty, L. Ding, D.R. Ellis, J.A. Epps, C.K. Estakhri, B.A. Glover, M.L. Hoelscher, N.D. Norboge, R. Rajbhandari, T.L. Ramani, T. Scullion, J.A. Shelton, C. Shon, W.R. Stockton, S.R. Vadali, S.P. Venglar, J. Zietsman

Publication Date:

April 2012

Abstract:

This research project evaluates numerous transportation issues and develops findings and/or recommendations based on results. This project has been structured to address some of the emerging, critical, and unique considerations related to transportation.

Report Number:

0-6581-TI-3

Keywords:

Electric Vehicle, Congestion, Project Assessment, Benefits, Project Evaluation, Loop 410, San Antonio, Modified Drilling Fluid, Delay

Electronic Link(s):

Document/Product: http://tti.tamu.edu/documents/0-6581-TI-3.pdf

Publication/Product Request

TTI reports and products are available for download at no charge. If an electronic version is not available and no instructions on how to obtain it are given, contact Publication Services at pubquest@ttimail.tamu.edu.