TxDOT Administration Research: Tasks Completed FY2011 (0-6581-TI-3)
Author(s):
S. Anderson, C.P. Beaty, L. Ding, D.R. Ellis, J.A. Epps, C.K. Estakhri, B.A. Glover, M.L. Hoelscher, N.D. Norboge, R. Rajbhandari, T.L. Ramani, T. Scullion, J.A. Shelton, C. Shon, W.R. Stockton, S.R. Vadali, S.P. Venglar, J. Zietsman
Publication Date:
April 2012
Abstract:
Report Number:
0-6581-TI-3
Keywords:
Electric Vehicle, Congestion, Project Assessment, Benefits, Project Evaluation, Loop 410, San Antonio, Modified Drilling Fluid, Delay
Electronic Link(s):
Document/Product: http://tti.tamu.edu/documents/0-6581-TI-3.pdf
Publication/Product Request
TTI reports and products are available for download at no charge. If an electronic version is not available and no instructions on how to obtain it are given, contact Publication Services at pubquest@ttimail.tamu.edu.

