2013 IH-35/SH 130 Commercial Vehicle Diversion Study: Technical Memorandum
Author(s):
S.P. Farnsworth, D.W. Borchardt
Publication Date:
March 2014
Abstract:
The Texas Transportation Commission authorized a one-year truck toll reduction period on Toll Road SH 130 that began on April 1, 2013. The purpose of the reduction was to improve safety and reduce congestion on IH-35 through central Austin by diverting more commercial trucks from IH-35 to SH 130. This memo serves as the Technical Memorandum documenting the analysis of data collected as part of this study.
Report Number:
TTI-2014-6
Electronic Link(s):
Document/Product
http://tti.tamu.edu/documents/TTI-2014-6.pdf
Publication/Product Request
TTI reports and products are available for download at no charge. If an electronic version is not available and no instructions on how to obtain it are given, contact the TTI Library.