Assistance with the Federal High-Speed Rail Corridor Application Process
Author(s):
S.S. Roop, R.W. Dickinson
Publication Date:
November 1994
Abstract:
A workplan was developed for a feasibility study of possible high-speed rail corridors in Texas. This workplan will serve the core document in any petition submitted to the Secretary of Transportation, and will represent the expected deliverables from contractors in a potential Request for Proposal issued from TxDOT.
Report Number:
2907-1F
Electronic Link(s):
Document/Product
http://tti.tamu.edu/documents/2907-1F.pdf
Publication/Product Request
TTI reports and products are available for download at no charge. If an electronic version is not available and no instructions on how to obtain it are given, contact the TTI Library.