In 2009, Dallas Area Rapid Transit (DART) began a fuel-transition program to replace its transit bus fleet with compressed natural gas (CNG)–fueled buses and to construct the necessary refueling infrastructure by 2012. Even though DART faced considerable up-front capital costs to build a fueling station and upgrade the existing gas pipeline, the low cost of […]