• Skip to primary navigation
  • Skip to main content
  • Jobs
  • Pressroom
  • MyTTI
  • Contact Us
  • Facebook
  • Twitter
  • LinkedIn
  • YouTube
  • Instagram
  • SlideShare
  • RSS

Texas A&M Transportation Institute

Saving Lives, Time and Resources.

  • About TTI
    • Overview
    • Academic Partners
    • Advisory Council
    • Hall of Honor
    • History
    • Sponsors
    • Participate in Research
  • Focus Areas
    • Connected Transportation
    • Economics
    • Environment
    • Freight
    • Human Interaction
    • Infrastructure
    • Mobility
    • Planning and Operations
    • Policy
    • Safety
    • Security
    • Workforce Development
  • Facilities
    • Connected Transportation
    • Infrastructure
    • Safety
    • Environment
    • Traffic Operations
    • Maps
  • Home
  • Centers
    • National
    • State
    • Research Internships
  • People
    • People Search
    • Directory
  • Publications
    • Catalog Search
    • Texas Transportation Researcher
Home / Publications / Catalog Search / Estimated Construction Period Impact of Widening State Highway 199 in Parker County, Texas

Estimated Construction Period Impact of Widening State Highway 199 in Parker County, Texas

Full-Text PDF

Author(s):

J.L. Buffington, M.T. Wildenthal

Publication Date

August 1997

Abstract

The upgrading and widening of highways across the state is causing the directly affected businesses and property owners to inquire about the possible economic impacts of such construction. This report documents the during- and after-construction effects of the widening of a 15.13 kilometer undivided section of State Highway (S.H.) 199, in Parker County, Texas. Between 1990 and 1994, it was widened to include two roadways separated by a ditch or a two-way left-turn lane.Collected data includes abutting managers' estimates of the construction impact on their businesses, on property values, and on highway traffic volumes, travel times, and accident rates. Responding Azle businesses lost 33% of their parking spaces and Springtown businesses lost 16%, but both reported fewer customers per day and 33% fewer occupied parking spaces during construction. The number of employees for most businesses was unaffected. The sales reported by abutting businesses increased slightly more than Azle gross sales, but increased less than Springtown or Parker County sales. Appraised abutting, Springtown, and Parker County property and land values fell during and after construction. The benefit-cost ratio was 2.95 for Azle and 1.48 for Springtown.The Texas input-output model estimates the construction expenditures' impacts to be $29.8 million in output and 453 jobs for the Texas economy from the Springtown project. For the Azle project, the estimated impacts are $13.4 million in output and 202 jobs for the Texas economy.

Report Number:

1260-2

Keywords:

Abutting Businesses, economic impact, Highway Widening, Property, Residents, Two-Way Left-Turn Lane

Link(s):

Document/Product

http://tti.tamu.edu/documents/1260-2.pdf

Publication/Product Request

TTI reports and products are available for download at no charge. If an electronic version is not available and no instructions on how to obtain it are given, contact the TTI Library.

  • The State of Texas
  • Texas Homeland Security
  • Texas Veterans Portal
  • State Expenditure Database
  • Statewide Search
  • State Auditor’s Office Hotline
  • TAMUS Risk, Fraud & Misconduct Hotline
  • Site Policies
  • Open Records Policy
  • Statutorily Required Reports
  • TTI Rules
  • Veterans
  • Equal Opportunity
  • COVID-19 Info
  • Jobs
Member of the Texas A&M University System

© 2025 Copyright Statement / Legal Notices and Policies

Comments, suggestions, or queries? Contact us!

Texas A&M Transportation Institute · 3135 TAMU · College Station, Texas 77843-3135

(979) 317-2000