Author(s):
G.L. Santerre
Publication Date
January 1967
Abstract
This research was primarily designed for two puposes: to investigate the feasibility of staggering working hours in Houston, Texas, and to evaluate the impact that staggered working hours of selected traffic generators would have on the morning peak period of operation of the Gulf Freeway.|In order to investigate this problem, three areas were selected for study:|1. The reaction of management to working hours change.|2. Magnitude of change required in Houston to evenly distribute traffic demand over a reasonable period.|3. Minimum size of organization that should be considered for work time change to achieve simplest staggered hours plan.|This research was not designed to formulate a complete staggered hours paln that could be immediately put into effect but was designed to investigate the feasibility and benefits of such a plan.
Report Number:
24-16
Keywords:
Staggered Work Hours
Link(s):
Document/Product
http://tti.tamu.edu/documents/24-16.pdf
Publication/Product Request
TTI reports and products are available for download at no charge. If an electronic version is not available and no instructions on how to obtain it are given, contact the TTI Library.