• Skip to primary navigation
  • Skip to main content
  • Jobs
  • Pressroom
  • MyTTI
  • Contact Us
  • Facebook
  • Twitter
  • LinkedIn
  • YouTube
  • Instagram
  • SlideShare
  • RSS

Texas A&M Transportation Institute

Saving Lives, Time and Resources.

  • About TTI
    • Overview
    • Academic Partners
    • Advisory Council
    • Hall of Honor
    • History
    • Sponsors
    • Participate in Research
  • Focus Areas
    • Connected Transportation
    • Economics
    • Environment
    • Freight
    • Human Interaction
    • Infrastructure
    • Mobility
    • Planning and Operations
    • Policy
    • Safety
    • Security
    • Workforce Development
  • Facilities
    • Connected Transportation
    • Infrastructure
    • Safety
    • Environment
    • Traffic Operations
    • Maps
  • Home
  • Centers
    • National
    • State
    • Research Internships
  • People
    • People Search
    • Directory
  • Publications
    • Catalog Search
    • Texas Transportation Researcher
Home / Publications / Catalog Search / Structural Monitoring of the World’s First Precast Network Arch Bridge during Construction

Structural Monitoring of the World’s First Precast Network Arch Bridge during Construction

Full-Text PDF

Author(s):

H. Yousefpour, T. Helwig, O. Bayrak

Publication Date

November 2014

Abstract

This report provides an overview of a monitoring study on the West 7th Street Bridge in Ft Worth, Texas that was carried out by The University of Texas at Austin (UT). The West 7th Street Bridge was designed by the Texas Department of Transportation (TxDOT) and is believed to be the first precast concrete network arch bridge in the world. The bridge consists of a series of prestressed concrete arches that were precast and post-tensioned at a staging area before they were transported to the bridge site and erected. Due to the innovative construction of this bridge, some of the most critical stresses in the life of the arches happened during construction. Therefore, an instrumentation program was conducted to make sure that the arches were not damaged during the fabrication, transport, and erection procedures. The researchers from UT embedded a series of Vibrating Wire Gages (VWGs) in the critical sections of arches and monitored the sensors throughout construction to ensure the safety of the arches. The recorded data also allowed the researchers to evaluate the accuracy of some of the assumptions that were necessary during the design of the arches. An overview of the monitoring effort and the major findings from instrumentation are provided in this document.

Report Number:

5-5253-03-1

Keywords:

Accelerated bridge construction, Arch bridge, concrete, Monitoring, Network arch, Post-tensioned, Precast, prestressed

Link(s):

Document/Product

http://library.ctr.utexas.edu/ctr-publications/5-5253-03-1.pdf

Publication/Product Request

TTI reports and products are available for download at no charge. If an electronic version is not available and no instructions on how to obtain it are given, contact the TTI Library.

  • The State of Texas
  • Texas Homeland Security
  • Texas Veterans Portal
  • State Expenditure Database
  • Statewide Search
  • State Auditor’s Office Hotline
  • TAMUS Risk, Fraud & Misconduct Hotline
  • Site Policies
  • Open Records Policy
  • Statutorily Required Reports
  • TTI Rules
  • Veterans
  • Equal Opportunity
  • COVID-19 Info
  • Jobs
Member of the Texas A&M University System

© 2025 Copyright Statement / Legal Notices and Policies

Comments, suggestions, or queries? Contact us!

Texas A&M Transportation Institute · 3135 TAMU · College Station, Texas 77843-3135

(979) 317-2000